Lilac Announces Successful Completion of Lithium Pilot Operations on the Great Salt Lake, Utah

Published: Oct 7, 2025 07:00
Lilac Solutions announced the successful completion of its lithium extraction pilot project on Utah’s Great Salt Lake, marking a key step toward building a commercial production facility at the site. The pilot achieved an average lithium recovery rate of 87% from brine with a lithium concentration of 69 mg/L (exceeding the design target of 84%) and an impurity rejection rate of 99.97%, demonstrating that Lilac’s ion-exchange DLE technology can economically and efficiently extract lithium from complex brines while protecting the lake’s ecosystem. The seven-month pilot processed more than one million gallons of brine and operated year-round without the need for heating or cooling. Third-party testing confirmed compliance with all discharge and operating permits. Lithium-depleted brine was reinjected into the lake, maintaining water levels, while avoiding the use of evaporation ponds. The process also requires significantly less land and freshwater than competing technologies. The pilot results will support FEL-3 engineering for the commercial plant as well as related permitting applications. Lithium eluate produced during the pilot was used to make battery-grade lithium carbonate samples for downstream testing. The first phase of the commercial facility is planned to produce 5,000 tonnes per year of lithium carbonate equivalent (LCE) — doubling current U.S. lithium production — with future expansion to 20,000 tonnes per year. First production is expected in 2027.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
【SMM Analysis】Zhongke Liquid Sunshine (Shawan) Green Hydrogen Zero‑Carbon Project Commences Construction
48 mins ago
【SMM Analysis】Zhongke Liquid Sunshine (Shawan) Green Hydrogen Zero‑Carbon Project Commences Construction
Read More
【SMM Analysis】Zhongke Liquid Sunshine (Shawan) Green Hydrogen Zero‑Carbon Project Commences Construction
【SMM Analysis】Zhongke Liquid Sunshine (Shawan) Green Hydrogen Zero‑Carbon Project Commences Construction
48 mins ago
1 Billion m²/Year Dry-Process Separator Project For Lithium/Sodium Batteries Lands In Nanning
4 hours ago
1 Billion m²/Year Dry-Process Separator Project For Lithium/Sodium Batteries Lands In Nanning
Read More
1 Billion m²/Year Dry-Process Separator Project For Lithium/Sodium Batteries Lands In Nanning
1 Billion m²/Year Dry-Process Separator Project For Lithium/Sodium Batteries Lands In Nanning
Recently, Nanning Urban Construction Investment Group and Huahui New Material Technology Co., Ltd. signed an agreement for the lithium/sodium battery dry-process separator intelligent manufacturing project. The total investment for the project is approximately 500 million yuan. It plans to build a new production line with an annual capacity of 1 billion square meters of dry-process separators for lithium/sodium batteries. The project will introduce Guangxi's first new-generation dry-process uniaxial stretching and 4.2-meter-wide biaxial stretching battery separator production line. It is expected that upon reaching full capacity, the annual output value will be approximately 800 million yuan, creating 170 jobs, and establishing the first battery base film production base in Guangxi.
4 hours ago
Shandong Binhe Hybrid Energy Storage Station Commences Operation
4 hours ago
Shandong Binhe Hybrid Energy Storage Station Commences Operation
Read More
Shandong Binhe Hybrid Energy Storage Station Commences Operation
Shandong Binhe Hybrid Energy Storage Station Commences Operation
Recently, the Binhe Haoyu 100MW/200MWh independent energy storage station in Zhucheng completed acceptance and entered commercial operation. The project was invested in by an energy storage industry fund jointly initiated by Corun, CALB, and Kaibo Capital. It was jointly developed by members of the large energy storage ecosystem consortium, including Corun, CALC, Goxia Technology, Duanrui Technology, and Star Energy New Energy. The station adopts a hybrid energy storage technology route combining "lithium iron phosphate + all-vanadium redox flow batteries," which can meet the grid's full-time-scale regulation needs while significantly reducing the lifecycle levelized cost of energy, enhancing overall system economy and safety, and maximizing operational efficiency and economic benefits.
4 hours ago
Lilac Solutions announced the successful completion of its lithium ext - Shanghai Metals Market (SMM)