NEV Purchase Tax to Resume in 2026 with 5% Rate and 15,000 Yuan Cap

Published: Sep 12, 2025 11:05
[Tax on NEV Purchases to Be Reinstated in 2026, with a Minimum 5% Vehicle Purchase Tax] 2025 marks the final year of China's vehicle purchase tax exemption policy for new energy vehicles, with taxation to resume next year, albeit with continued incentives. According to the "Announcement on Extending and Optimizing the Policy for Reducing and Exempting Vehicle Purchase Tax on New Energy Vehicles" issued by the Ministry of Finance and other authorities in 2023, NEVs purchased between January 1, 2026, and December 31, 2027, will be subject to a 50% reduction in vehicle purchase tax, with the tax reduction for each passenger NEV not exceeding 15,000 yuan. This means that individuals and entities purchasing NEVs in 2026 and 2027 will resume paying vehicle purchase tax but will still enjoy a 50% tax reduction. The current vehicle purchase tax rate is 10%, so a 50% reduction for NEVs implies an effective tax rate of 5%. However, to prevent high-end luxury NEVs from consuming excessive vehicle purchase tax incentives, the Announcement sets a maximum limit on the tax reduction for NEVs over the next two years, capping the tax reduction per vehicle at 15,000 yuan.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
15 hours ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
15 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
16 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
16 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
16 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
16 hours ago
[Tax on NEV Purchases to Be Reinstated in 2026, with a Minimum 5% Vehi - Shanghai Metals Market (SMM)