NEA's Du Zhongming Urges Acceleration of Unified Power Market System and Enhanced Demand-Side Flexibility for New Energy Integration

Published: Aug 31, 2025 21:52
[Du Zhongming of the National Energy Administration: Accelerate the Construction of a Nationally Unified Power Market System and Fully Leverage the Flexible Regulation Role of the Demand Side] Du Zhongming, Director of the Electricity Department at the National Energy Administration, stated that in response to the unstable output characteristics of new energy, efforts will be accelerated to promote the construction of system-friendly new energy power stations. By improving the prediction accuracy of wind and solar power generation, power stations and the power grid can operate with greater certainty. Through the integrated multi-energy complementary development model and joint regulation and operation of wind, solar, hydro, and thermal power, the autonomous regulation and active support capabilities of wind and PV power generation will be enhanced. The construction of a nationally unified power market system will be expedited, and the power market mechanism adapted to the characteristics of new energy generation will be refined to support high-proportion new energy participation in the market and expand the scale of new energy market transactions. Inter-provincial power trading will be optimized to enhance regional resource sharing and mutual support capabilities, promoting the optimal allocation of new energy across broader areas.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
4 hours ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
4 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
4 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
4 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
4 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
4 hours ago