The 2000-ton decommissioned power battery recycling project in Yueyang, Hunan is about to be put into production.

Published: Aug 25, 2025 12:13
[SMM New Energy News Flash] Hunan Xianen New Energy Technology Co., Ltd. has completed environmental protection acceptance for its 50 million RMB project dedicated to cascade utilization of retired power batteries, capable of processing 2,000 tons annually (LFP, ternary, manganese-based) and producing 10,000 energy storage cabinets for industrial, telecom, and low-speed transport applications. By repurposing rather than dismantling cells, the project maximizes resource value and supports a circular economy, forming part of Xianen Group’s dual strategy of “cascade utilization + commercial storage.” With China’s retired battery volume projected to reach 780,000 tons in 2025, cascade utilization offers both environmental and economic advantages up to three to four times higher returns than direct recycling and is already widely applied in zero-carbon buildings, grid peak shaving, and telecom stations. Despite challenges in testing and standardization, supportive policies and technological advances are accelerating commercialization, with experts forecasting a market exceeding 100 billion RMB by 2030, making cascade utilization a key driver for China’s green energy transition and global sustainable battery supply chain.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
21 mins ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
21 mins ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
24 mins ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
24 mins ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
25 mins ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
25 mins ago