Overhaul Equipment Integration for Electrical System of 1780 Coil Splitting Line in Hot Rolling Mill - Tender for Copper Busbar Procurement

Published: Aug 8, 2025 17:29

Procurement Announcement for Equipment Integration and Copper Busbar Procurement in the Overhaul of the Electrical System for the 1780 Coil Splitting Line at the Hot Rolling Mill

1. Procurement Conditions

The procurer for this procurement project, Equipment Integration and Copper Busbar Procurement in the Overhaul of the Electrical System for the 1780 Coil Splitting Line at the Hot Rolling Mill (AGAGSZHGXHD250808229420), is the Centralised Procurement Platform of the Marketing Center of Angang Digital Intelligence Technology (Liaoning) Co., Ltd. The funds for this procurement project are self-raised. The project now meets the procurement conditions and is open for public inquiry and comparison.

2. Project Overview and Procurement Scope

2.1 Project Name: Equipment Integration and Copper Busbar Procurement in the Overhaul of the Electrical System for the 1780 Coil Splitting Line at the Hot Rolling Mill

2.2 Alternative Procurement Method in Case of Failure: Negotiated Procurement

2.3 For details on the procurement content, scope, and scale of this project, please refer to the attached "Bill of Materials Attachment.pdf".

3. Bidder Qualification Requirements

3.1 Joint bidding is not allowed for this procurement.

3.2 Bidders for this procurement must meet the following qualification requirements:

(1) A circulation-type business license

(2) A production-type business license

3.3 Bidders for this procurement must meet the following registered capital requirements:

Production-type registered capital: 1 million yuan or above

Circulation-type registered capital: 1 million yuan or above

3.4 Bidders for this procurement must meet the following performance requirements:

Please refer to the attachment for details (if necessary).

3.5 Bidders for this procurement must meet the following capability, financial, and other requirements:

Financial requirements: Please refer to the attachment for details (if necessary).

Capability requirements: Please refer to the attachment for details (if necessary).

Other requirements: 1. The following enterprise qualification requirements that have passed the annual inspection must be provided:

(1) Scanned copies or photos of the original business license (or duplicate);

(2) Scanned copies or photos of the original tax registration certificate (or duplicate) (except for those with a unified three-in-one certificate);

(3) Scanned copies or photos of the original organization code certificate (or duplicate) (except for those with a unified three-in-one certificate).

3.6 For projects that must be tendered according to the law, bids from dishonest persons subject to enforcement are invalid for this procurement.

4. Acquisition of Procurement Documents

4.1 All interested bidders are requested to log in to the Angang Smart Tendering and Bidding Platform at http://bid.ansteel.cn from 13:00 on August 8, 2025, to 13:00 on August 18, 2025 (Beijing time, the same hereinafter) to download the electronic procurement documents.

Click to view tender details:

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Chile's Water Crisis Threatens Atacama's Copper and Lithium Mining Amid 14-Year Drought
Apr 3, 2026 19:10
Chile's Water Crisis Threatens Atacama's Copper and Lithium Mining Amid 14-Year Drought
Read More
Chile's Water Crisis Threatens Atacama's Copper and Lithium Mining Amid 14-Year Drought
Chile's Water Crisis Threatens Atacama's Copper and Lithium Mining Amid 14-Year Drought
Chile’s most pressing crisis at present is the issue of water resources. The Atacama Desert in Chile is one of the driest regions in the world and also the core area for copper and lithium ore extraction. The local area has experienced a drought for as long as 14 years, and reservoir storage has fallen to only about 30%. For miners, water resources are not a secondary issue, but an indispensable key production factor in such processes as ore processing, dust suppression, and equipment cooling. The decline in ore grade has further exacerbated the predicament
Apr 3, 2026 19:10
Trump Adjusts Metal Tariffs, Applies 50% Rate to Consumer Prices Under Section 232, Details Unclear
Apr 3, 2026 19:09
Trump Adjusts Metal Tariffs, Applies 50% Rate to Consumer Prices Under Section 232, Details Unclear
Read More
Trump Adjusts Metal Tariffs, Applies 50% Rate to Consumer Prices Under Section 232, Details Unclear
Trump Adjusts Metal Tariffs, Applies 50% Rate to Consumer Prices Under Section 232, Details Unclear
US President Trump adjusted the national security tariffs on imports of steel, aluminum, and copper, lowering the tariff rates on derivative products made from these metals, streamlining compliance procedures, and preventing the declared value of imports from being understated.A senior Trump administration official said that, under a proclamation signed by Trump, the US would continue to maintain a 50% import tariff on imports of metal commodities such as steel, aluminum, and copper pursuant to Section 232 of the Trade Act of 1974, but would apply this rate to the price paid by US consumers. It is currently unclear how the selling price—and the resulting tariffs—would be determined.
Apr 3, 2026 19:09
Barrick Confirms 2028 Production Target for Reko Diq Copper-Gold Project in Pakistan Despite Budget Concerns
Apr 3, 2026 19:08
Barrick Confirms 2028 Production Target for Reko Diq Copper-Gold Project in Pakistan Despite Budget Concerns
Read More
Barrick Confirms 2028 Production Target for Reko Diq Copper-Gold Project in Pakistan Despite Budget Concerns
Barrick Confirms 2028 Production Target for Reko Diq Copper-Gold Project in Pakistan Despite Budget Concerns
Barrick Mining said that its Reko Diq copper-gold project in Pakistan still plans to achieve first production by the end of 2028.The project is a large-scale copper-gold project jointly developed by Barrick, the Pakistani government, and relevant joint venture partners, and is located in Balochistan, Pakistan. Although the company had previously warned that the capital budget previously disclosed for the project's two phases could face a significant increase, the 2028 production commencement target remained unchanged.
Apr 3, 2026 19:08