Tender for procurement of a batch of cables and other materials

Published: Jul 31, 2025 14:39

1. Procurement Conditions

The purchaser of this procurement project, which involves a batch of materials including cables (PGPGAHHHD250730227250), is the Safety and Environmental Protection Department of Pangang Group Engineering Technology Co., Ltd. The funds for this procurement project are self-raised, and the project is now ready for procurement. A single-round open negotiation is being conducted.

2. Project Overview and Procurement Scope

2.1 Project Name: A Batch of Materials Including Cables

2.2 Alternative Procurement Method if Current One Fails: Not applicable

2.3 For detailed information on the procurement content, scope, and scale of this project, please refer to the attached "Material List Attachment.pdf".

3. Bidder Qualification Requirements

3.1 Joint bidding is not allowed for this procurement.

3.2 Bidders for this procurement must meet the following qualification requirements:

(1) A circulation-type business license

(2) A production-type business license

3.3 Bidders for this procurement must meet the following registered capital requirements:

Production-type registered capital: 2 million yuan or more

Circulation-type registered capital: 1 million yuan or more

3.4 Bidders for this procurement must meet the following performance requirements:

Please refer to the attachment for details (if necessary).

3.5 Bidders for this procurement must meet the following capability, financial, and other requirements:

Financial requirements: Please refer to the attachment for details (if necessary).

Capability requirements: Production-type suppliers must have a registered capital of 2 million yuan or more, and circulation-type suppliers must have a registered capital of 1 million yuan or more.

Other requirements: 1. The following enterprise qualification requirements, which must pass annual inspection, are required:

(1) Scanned copies of the business license (or duplicate);

(2) Scanned copies of the tax registration certificate (or duplicate), except for those with a unified three-in-one certificate;

(3) Scanned copies of the organization code certificate (or duplicate), except for those with a unified three-in-one certificate;

(4) For products listed in the 3C product certification directory, scanned copies of the 3C certification certificate must be provided (not applicable for this project);

2. Performance requirements: None

3.6 For projects that must be tendered according to the law, bids from dishonest persons subject to enforcement are invalid.

4. Acquisition of Procurement Documents

4.1 Those interested in participating in the bidding should log in to the Ansteel Smart Tendering and Bidding Platform at http://bid.ansteel.cn between 20:00 on July 30, 2025, and 13:45 on August 5, 2025 (Beijing time, the same hereinafter) to download the electronic procurement documents.

Click to view tender details:

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Ferrous Metals May Continue Trading at Elevated Levels in the Short Term [SMM Steel Industry Chain Weekly Report]
Mar 27, 2026 18:45
Ferrous Metals May Continue Trading at Elevated Levels in the Short Term [SMM Steel Industry Chain Weekly Report]
Read More
Ferrous Metals May Continue Trading at Elevated Levels in the Short Term [SMM Steel Industry Chain Weekly Report]
Ferrous Metals May Continue Trading at Elevated Levels in the Short Term [SMM Steel Industry Chain Weekly Report]
This week, ferrous metals retreated after a rapid rise. At the beginning of the week, the market said that Asia had shifted to coal-fired power generation due to a natural gas supply deficit, while Indonesia would increase coal production and impose export taxes. The rise in international coal prices was transmitted to China, and coking coal and coke led the gains in ferrous metals; mid-week, the Middle East situation remained volatile, and the U.S. and Iran held differing attitudes toward war, with ferrous metals consolidating at high levels; the pullback in the second half of the week was also mainly due to the weakening of the cost-side logic, as market rumors said long-term iron ore contract negotiations had been completed, expectations for tightening iron ore supply declined, and raw materials turned into the main driver of the pullback. In the spot market, speculative trading and end-user purchase sentiment improved in the first half of the week, while rigid demand remained dominant in the second half, and the spot-futures price spread widened somewhat......
Mar 27, 2026 18:45
Centralized Production Resumptions Conclude, Limiting Further Supply Increases from EAF Steel Mills
Mar 27, 2026 18:26
Centralized Production Resumptions Conclude, Limiting Further Supply Increases from EAF Steel Mills
Read More
Centralized Production Resumptions Conclude, Limiting Further Supply Increases from EAF Steel Mills
Centralized Production Resumptions Conclude, Limiting Further Supply Increases from EAF Steel Mills
As of March 24, the operating rate of 50 electric-furnace steel mills nationwide mainly producing construction materials was 40.42%, up 1.78% WoW from the previous period; the capacity utilization rate was 41.75%, up 1.88% WoW from the previous period; and daily average production of construction materials was 93,000 mt, up 4,200 mt WoW.
Mar 27, 2026 18:26
MMi Daily Iron Ore Report (March 27)
Mar 27, 2026 18:11
MMi Daily Iron Ore Report (March 27)
Read More
MMi Daily Iron Ore Report (March 27)
MMi Daily Iron Ore Report (March 27)
The iron ore futures rose in early trading before gradually retreating during the day. The main contract I2605 ultimately closed at 812 yuan/ton, down 0.49% from the previous trading session.
Mar 27, 2026 18:11
Tender for procurement of a batch of cables and other materials - Shanghai Metals Market (SMM)