[BTR's 200,000 mt/year Lithium Battery Anode Material Project in Yunnan]
The project is located in the Caifu Industrial Park, Xiangyun County, Dali Autonomous Prefecture, Yunnan Province, with a total construction area of 318,800 m². It includes workshops, production equipment, detection equipment, and public works such as water, electricity, and gas facilities. During the construction process, energy and materials will be effectively utilized to reduce energy consumption and achieve a fully integrated value chain. By improving the factory structure, digitizing the factory, and optimizing factory processes, production efficiency will be enhanced, enabling an annual output of 200,000 mt of lithium battery anode materials.
Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market exchanges, and relying on SMM's internal database model, for reference only and do not constitute decision-making recommendations.