【SMM Analysis】The European Union's Extended Producer Responsibility (EPR) Regulations for Batteries have come into full effect.

Published: Jul 28, 2025 09:50
Source: SMM
The European Union Batteries and Waste Batteries Regulation (2023/1542) officially entered into force on August 17, 2023, establishing a legally binding framework for the full life cycle management of batteries for all member states

The European Union Batteries and Waste Batteries Regulation (2023/1542) officially entered into force on August 17, 2023, establishing a legally binding framework for the full life cycle management of batteries for all member states. Although some provisions have already been implemented, the key Extended Producer Responsibility (EPR) and labeling obligations will officially enter into force on August 18, 2025, marking an important turning point for the European Union in the fields of sustainable development, circular economy, and environmental protection. The European Union's new battery regulation, which replaces (2006/66/EC), will be fully implemented in August 2025, applying to portable, SLI start-stop, LMT light vehicle, industrial, and electric vehicle batteries. It requires producers to complete registration in each sales country, bear the full cost of battery recycling, and mandatorily label waste symbols, traceability QR codes, and chemical components.

Starting from August 2025, all battery producers must fulfill Extended Producer Responsibility (EPR) obligations, including completing registration in each country of sale and assuming full life-cycle financial responsibility for the recycling, disposal, and reuse of waste batteries. Meanwhile, producers must strictly implement new labeling regulations, including affixing the crossed-out trash can symbol, chemical composition description, and traceable QR code. It is estimated that by 2027, electric vehicle, industrial, and LMT batteries must be equipped with digital battery passports to ensure transparency of information such as material origin, carbon footprint, and recyclability. This regulation requires enterprises to make large-scale investments in supply chain tracking, recycling infrastructure, and labeling systems. Despite the high compliance costs, this regulation will bring significant long-term benefits, especially in promoting the circular economy. By 2031, the mandatory proportion of recycled materials will significantly reduce dependence on raw materials. The new regulation will also enhance product traceability and consumer transparency through QR codes and battery passports. For enterprises that plan ahead, this means a competitive advantage in gaining market trust and avoiding the risk of penalties. It is worth noting that with the implementation of the Extended Producer Responsibility (EPR) system, the collection rate of batteries in the European Union is expected to increase rapidly, effectively reducing heavy metal pollution of soil and water sources. Currently, only 5% of lithium-ion batteries globally are properly recycled, and after the implementation of the new regulation, this proportion is expected to exceed 70% in the European Union, setting a new benchmark for global battery recycling.

SMM believes that the European Union's new battery regulations will pose severe challenges to small and medium-sized enterprises (SMEs) in the short term, as high compliance costs will disproportionately squeeze the profit margins of small and medium-sized battery manufacturers. However, leading enterprises with strategic vision are turning this transformation into an opportunity, by restructuring the battery industry ecosystem, converting compliance costs into long-term value creation advantages. This transformation will drive the entire battery lifecycle management, from production to recycling, to truly achieve green and sustainable development.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
3 hours ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
3 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
3 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
3 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
4 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
4 hours ago
【SMM Analysis】The European Union's Extended Producer Responsibility (EPR) Regulations for Batteries have come into full effect. - Shanghai Metals Market (SMM)