On July 20, the first phase of the energy-saving renovation project for the second stage of the Baise Guangxi Investment Group Yinhai Aluminum Electrolysis Project, with an existing capacity of 50,000 mt and a total of 84 electrolytic cells, entered the stage of electrolytic cell startup and production resumption. This marked a significant milestone for the project, with production increasing by 8% after the renovation, and the comprehensive energy consumption level decreasing by approximately 700 kWh/t-Al, reaching the industry's energy efficiency benchmark level. Carbon dioxide emissions were reduced by approximately 40,000 mt, injecting strong momentum into the enterprise's green transformation and technological upgrading.
Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market exchanges, and relying on SMM's internal database model, for reference only and do not constitute decision-making recommendations.