Tender for the Procurement of 600 mt of Pig Iron Q10 by Ansteel Heavy Machinery Roll Co., Ltd.

Published: Jul 25, 2025 09:25

1. Procurement Conditions

The procurer of this procurement project, which involves the purchase of 600 mt of pig iron Q10 from Ansteel Heavy Machinery Roll Co., Ltd. (AGZJGSHGXHD250724226064), is the Procurement Center of Ansteel Heavy Machinery Co., Ltd. The funds for this procurement project are self-raised, and the project is now ready for open inquiry and comparison.

2. Project Overview and Procurement Scope

2.1 Project Name: Purchase of 600 mt of Pig Iron Q10 from Ansteel Heavy Machinery Roll Co., Ltd.

2.2 Alternative Procurement Method in Case of Failed Bidding: Not applicable

2.3 For detailed information on the procurement content, scope, and scale of this project, please refer to the attached "Material List Attachment.pdf".

3. Bidder Qualification Requirements

3.1 Consortium bidding is not allowed for this procurement.

3.2 Bidders for this procurement must meet the following qualification requirements:

(1) Production-oriented business license

(2) Circulation-oriented business license

3.3 Bidders for this procurement must meet the following registered capital requirements:

Production-oriented registered capital: 5 million yuan or above

Circulation-oriented registered capital: 5 million yuan or above

3.4 Bidders for this procurement must meet the following performance requirements:

1. Required documents for enterprise qualification verification:

(1) Scanned copy of business license (or duplicate)

(2) Scanned copy of tax registration certificate (or duplicate) (except for those with a unified three-in-one certificate)

(3) Scanned copy of organization code certificate (or duplicate) (except for those with a unified three-in-one certificate)

2. Performance requirements: Provide a scanned copy of a contract and corresponding invoice for at least 100 mt of pig iron that meets the tender requirements.

3.5 Bidders for this procurement must meet the following capability, financial, and other requirements:

Financial requirements: Please refer to the attached document (if necessary)

Capability requirements: Please refer to the attached document (if necessary)

Other requirements: (1) Bidding manufacturers must conduct technical exchanges with the site. Otherwise, if the proposed winning bidder fails to meet production requirements and deadlines as required, does not sign the contract, or fails to complete the project as required after signing the contract, and is held accountable, its qualification as a relevant party will be revoked, and it will not be allowed to participate in any bidding projects of Ansteel Roll Co., Ltd. for two years. It will also be reported to Ansteel Group Corporation and listed as a gray-listed or black-listed enterprise.

(2) Provide a product quality certificate for the past year, with the inspection agency required to have qualifications at or above the prefectural level.

(3) Measurement method: The measurement quantity shall be based on that of the Ansteel Stock Co., Ltd. Measurement Center.

(4)出卖人同意根据买受人生产实际需要调整供货时间以及数量。

(5)投标供应商必须有现货货源,一旦中标,需及时陆续交货。

(6)本次招标收取合同履约保证金5%。

(7)敞车散装,清净车底,不混杂物,其中:S、P、Si指标未达标,视为不合格产品,需要返回。对抽检元素超标扣款如下:Q10:0.7%<Mn≤0.72扣款不含税20元/吨,,Mn>0.72%扣款不含税80元/吨.Mn>0.9%为不合格产品。

(8)为保持生产的连续性和保证我公司产品质量,引进更多的供应商参与投标竞争,首次中标鞍钢轧辊公司该项目的供方,需进行现场审核认证,合格后,方可签订"以供代试"合同,签订"以供代试"合同份额不超过招标总量的30%,原供应商同意跟标,中标量为招标总量的70%,新进供应商中标量为总量的30%。

3.6 本次采购要求依法必须进行招标的项目,失信被执行人投标无效。

4. 采购文件的获取

4.1 凡有意参加投标者,请于2025年07月24日19时00分至2025年08月01日13时00分(北京时间,下同),登录鞍钢智慧招投标平台http://bid.ansteel.cn下载电子采购文件。

点击查看详情:

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Before the holiday, the black chain is unlikely to see a trend-driven market [SMM Steel Industry Chain Weekly Report].
Feb 6, 2026 18:30
Before the holiday, the black chain is unlikely to see a trend-driven market [SMM Steel Industry Chain Weekly Report].
Read More
Before the holiday, the black chain is unlikely to see a trend-driven market [SMM Steel Industry Chain Weekly Report].
Before the holiday, the black chain is unlikely to see a trend-driven market [SMM Steel Industry Chain Weekly Report].
This week, ferrous metals were in the doldrums, with coking coal and coke staging a mid-week rise. At the beginning of the week, financial markets experienced sharp fluctuations, dragging down sentiment in the ferrous chain and leading to a pullback in futures. Mid-week, Indonesia's cut to coke production quotas drove coking coal and coke futures to lead the gains, though the impact was more pronounced on thermal coal, while coking coal's rise was largely sentiment-driven and short-lived. In the latter part of the week, finished products continued their seasonal inventory buildup, and support from the raw material side weakened, causing the entire ferrous chain to pull back. In the spot market, with the Chinese New Year holiday approaching, purchasing activity slowed down further, with end-users only making limited, as-needed purchases at low prices.
Feb 6, 2026 18:30
MMi Daily Iron Ore Report (February 6)
Feb 6, 2026 18:09
MMi Daily Iron Ore Report (February 6)
Read More
MMi Daily Iron Ore Report (February 6)
MMi Daily Iron Ore Report (February 6)
Today, the DCE iron ore futures continued to hit bottom today, with the most-traded contract I2605 closing at 760.5 yuan/mt, down 1.23% from the previous trading day. Spot prices fell by 5–10 yuan/mt compared to the previous trading day.
Feb 6, 2026 18:09
[SMM Chromium Daily Review] Inquiries and Transactions Weakened, Chromium Market Showed Mediocre Performance Before the Holiday
Feb 6, 2026 17:41
[SMM Chromium Daily Review] Inquiries and Transactions Weakened, Chromium Market Showed Mediocre Performance Before the Holiday
Read More
[SMM Chromium Daily Review] Inquiries and Transactions Weakened, Chromium Market Showed Mediocre Performance Before the Holiday
[SMM Chromium Daily Review] Inquiries and Transactions Weakened, Chromium Market Showed Mediocre Performance Before the Holiday
[SMM Chrome Daily Review: Trading and Inquiries Weakened, Chrome Market Showed Mediocre Performance Before the Holiday] February 6, 2026: Today, the ex-factory price of high-carbon ferrochrome in Inner Mongolia was 8,500-8,600 yuan/mt (50% metal content), flat MoM from the previous trading day...
Feb 6, 2026 17:41