【SMM Analysis】Ghana Moves to Revise Ewoyaa Lithium Deal as Price Plunge Threatens Viability

Published: Jul 18, 2025 18:50
Source: SMM
Ghana's government is preparing to renegotiate terms of the Ewoyaa lithium mining agreement after a precipitous drop in global lithium prices has jeopardized the project's economic feasibility.

The dramatic price collapse has seen lithium spodumene values tumble from $3,000 per tonne to current levels around $700 per tonne - barely covering the production costs outlined in the project's feasibility study, according to Lands and Natural Resources Minister Emmanuel Amarnh Kofi Buah during Wednesday's parliamentary session.

This market turmoil has triggered a wave of production cuts, workforce reductions and project delays across the global lithium sector, with Ghana's domestic Ewoyaa operation now caught in the downturn.

Facing these challenges, project operator Barari DV Ghana Limited has formally requested amendments to its 15-year mining lease covering 42.63 square kilometers in Central Region's Mankessim area, originally granted in October 2023.

While the lease agreement was submitted to Parliament in 2024 and reviewed by the Select Committee on Lands and Natural Resources, its ratification was postponed due to parliamentary recess during the 2024 general elections. With market conditions continuing to deteriorate, the government is now preparing to present revised terms to cabinet.

Minister Buah confirmed his ministry has already briefed the cabinet and will soon submit a detailed memorandum outlining proposed contractual adjustments. These revisions aim to establish a sustainable path forward for the project while protecting Ghana's strategic interests in the rapidly evolving battery metals sector.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
20 hours ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
20 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
20 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
20 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
20 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
20 hours ago
【SMM Analysis】Ghana Moves to Revise Ewoyaa Lithium Deal as Price Plunge Threatens Viability - Shanghai Metals Market (SMM)