[SMM PV Express] According to SMM, the foundation pouring of the steam turbine for the China Energy Construction Hami "PV (Thermal) Storage" 1,500 MW Multi-Energy Complementary Integrated Green Electricity Demonstration Project has been completed. This marks a key milestone for Xinjiang's largest single-unit solar thermal project, laying the foundation for subsequent grid-connected power generation. The project has a total installed capacity of 1,500 MW, with an estimated annual power generation of nearly 2.9 billion kWh. It adopts a new generation of solar thermal technology, with a localization rate of core equipment exceeding 99%. By combining solar thermal and PV operations, it stabilizes power supply fluctuations and enhances power quality, aiming to create a 100% clean and adjustable power grid-friendly power supply model.