Affected by the continuous high temperatures, as of July 7, the peak electricity load of Jiangsu's power grid had set a new historical record for the third time this year, reaching 152 million kW. On July 6, under the unified command of the Power Dispatching Center of State Grid Jiangsu Electric Power Co., Ltd., 93 new-type energy storage power stations across the province collectively discharged power to the grid during the evening peak electricity usage period, with a maximum discharge power of 7.14 million kW, achieving the largest-scale centralized dispatching of new-type energy storage in China.