SD Lomon and Fulin Precision Machining Signed a Cooperation Agreement

Published: Jul 6, 2025 20:31
On July 2, Sichuan Development Lomon Co., Ltd. announced that it had signed a "Cooperation Framework Agreement" with Fulin Precision Machining Co., Ltd. The two parties will collaborate in the areas of equity and capital, as well as LFP projects and precursor projects.
The agreement includes the joint establishment of a joint venture company to invest in and construct a new 100,000 mt/year high-pressure dense LFP project and a 100,000 mt/year lithium dihydrogen phosphate precursor project, with the proposed location being the Mianzhu City Deyang-Aba Ecological Economic Industrial Park.
The cooperation aims to leverage the professional and resource advantages of both parties in the industrial sector, further improving SD Lomon's multi-resource green circular economy industry chain of "sulfur-phosphorus-titanium-iron-lithium-calcium". The agreement is a framework agreement, and the specific implementation content and schedule are subject to uncertainties. Both parties need to negotiate and sign a project investment cooperation agreement separately, which will be subject to the approval of the competent authorities.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
10 hours ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
10 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
10 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
10 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
10 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
10 hours ago
On July 2, Sichuan Development Lomon Co., Ltd. announced that it had s - Shanghai Metals Market (SMM)