Home / Metal News / Tender for Pig Iron Q10 Procurement of Angang Heavy Machinery Roller Company

Tender for Pig Iron Q10 Procurement of Angang Heavy Machinery Roller Company

iconJul 3, 2025 16:24
Source:SMM

1. Procurement Conditions

The purchaser of this procurement project, Pig Iron Q10 (AGZJGSHGXHD250703221492) for Ansteel Heavy Machinery Roller Company, is the Procurement Center of Ansteel Heavy Machinery Co., Ltd. The funds for this procurement project are self-raised. The project has met the procurement conditions and is now open for public inquiry and comparison.

2. Project Overview and Procurement Scope

2.1 Project Name: Pig Iron Q10 for Ansteel Heavy Machinery Roller Company

2.2 Alternative Procurement Method in Case of Failed Procurement: Negotiated Procurement

2.3 For details on the procurement content, scope, and scale of this project, please refer to the attached "Material List Attachment.pdf".

3. Bidder Qualification Requirements

3.1 Joint bidding is not allowed for this procurement.

3.2 For this procurement, the bidder must meet the following qualification requirements:

(1) Production-oriented business license

(2) Circulation-oriented business license

3.3 For this procurement, the bidder must meet the following registered capital requirements:

Registered capital for production-oriented enterprises: 5 million yuan or above

Registered capital for circulation-oriented enterprises: 5 million yuan or above

3.4 For this procurement, the bidder must meet the following performance requirements:

1. Requirements for providing enterprise qualifications that have passed the annual inspection:

(1) Scanned copy of the business license (or duplicate).

(2) Scanned copy of the tax registration certificate (or duplicate), except for those with a unified three-in-one certificate.

(3) Scanned copy of the organization code certificate (or duplicate), except for those with a unified three-in-one certificate.

2. Performance requirements: Provide a scanned copy of a contract and corresponding invoice for no less than 100 mt of goods that meet the tendering requirements.

3.5 For this procurement, the bidder must meet the following capability requirements, financial requirements, and other requirements:

Financial requirements: Please refer to the attachment (if necessary).

Capability requirements: Please refer to the attachment (if necessary).

Other requirements: (1) The bidding manufacturer must conduct technical exchanges with the site. Otherwise, if the proposed winning bidder fails to meet production requirements and deadlines as required, does not sign the contract, or fails to complete the work as required after signing the contract, and is held accountable, its qualification as a relevant party will be revoked, and it will not be allowed to participate in any project bidding of Ansteel Roller Co., Ltd. for two years. It will also be reported to Ansteel Group Corporation and listed as a gray-listed or black-listed enterprise.

(2) Provide a product quality certificate for the past year, with the inspection agency required to have qualifications at or above the prefectural level.

(3) Measurement method: The measurement quantity shall be based on that of the Ansteel Stock Measurement Center.

(4) The Seller agrees to adjust the delivery time and quantity according to the actual production needs of the Buyer.

(5) The bidding supplier must have spot cargo sources. Once winning the bid, the supplier shall deliver the goods in a timely and sequential manner.

(6) A 5% contract performance bond shall be collected for this tender.

(7) The goods shall be transported in open-top wagons in bulk, with a clean wagon bottom and no impurities. If the S, P, or Si indicators do not meet the standards, the product shall be deemed unqualified and needs to be returned. The following deductions shall be made for elements exceeding the standard in spot checks: L10: If 0.7% < Mn ≤ 0.72, a deduction of 20 yuan/mt (excluding tax) shall be made; if Mn > 0.72%, a deduction of 80 yuan/mt (excluding tax) shall be made. If Mn > 0.9%, the product shall be deemed unqualified.

(8) To maintain the continuity of production and ensure the quality of our company's products, and to introduce more suppliers to participate in the bidding competition, suppliers who win the bid for the first time for this project of Angang Roller Company shall undergo an on-site audit and certification. After passing the audit, a "supply instead of trial" contract may be signed. The share of the "supply instead of trial" contract shall not exceed 30% of the total tender volume. The original supplier agrees to follow the bid, with a winning bid volume of 70% of the total tender volume, and the new supplier's winning bid volume shall be 30% of the total volume.

3.6 For projects that must be tendered according to the law in this procurement, the bids of dishonest persons under execution shall be invalid.

4. Acquisition of Procurement Documents

4.1 Those interested in participating in the bidding shall log in to the Angang Smart Tendering and Bidding Platform at http://bid.ansteel.cn from 13:00 on July 3, 2025, to 13:00 on July 11, 2025 (Beijing time, the same hereinafter) to download the electronic procurement documents.

Click to view the tender details: 》Procurement Announcement for Pig Iron Q10 of Angang Heavy Machinery Roller Company

For queries, please contact Lemon Zhao at lemonzhao@smm.cn

For more information on how to access our research reports, please email service.en@smm.cn

SMM Events & Webinars

All