[SMM Analysis]India's SECI Issues Large-Scale Solar Plus ESS Tender

Published: Jun 29, 2025 15:36
Source: SMM
[SMM Analysis]On June 19, 2025, the Solar Energy Corporation of India (SECI) issued a Request for Selection (RfS) document, initiating a competitive tendering process. SECI, a government enterprise under the Ministry of New and Renewable Energy (MNRE) of India, aims to advance the National Solar Mission. Similar to other solar + ESS tenders previously organized by SECI, the successful developers will sign a 25-year Power Purchase Agreement (PPA) with SECI to undertake the projects under a Build-Own-Operate (BOO) model. SECI will subsequently sell the electricity generated by the projects to designated buying entities. The addition of Battery Energy Storage Systems (BESS) to the projects will enable power supply during peak periods.

On June 19, 2025, the Solar Energy Corporation of India (SECI) issued a Request for Selection (RfS) document, initiating a competitive tendering process. SECI, a government enterprise under the Ministry of New and Renewable Energy (MNRE) of India, aims to advance the National Solar Mission.

Similar to other solar + energy storage system (BESS) tenders previously organized by SECI, the successful developers will sign a 25-year Power Purchase Agreement (PPA) with SECI to carry out the projects under a Build-Own-Operate (BOO) model. SECI will then sell the electricity generated by the projects to designated buying entities. The addition of BESS to the projects will enable power supply during peak electricity consumption periods.

This means that the sellers will be required to deliver clean energy to the buyers during a 6-hour peak period each day, specifically from 6 PM to 9 AM the next morning. During each peak period selected by the buying entities, the batteries must have the capability to discharge continuously for 1 hour. Developers must be able to supply 3,000 kWh of electricity per megawatt alternating current (MWac) of installed solar PV capacity during the specified peak periods.

The pre-bid meeting for this tender is scheduled for July 10, 2025, and bidding will commence on August 21.

SECI's tenders, along with those of other government agencies in India and abroad, are considered to have driven the procurement process in India's emerging ESS sector. At a recent seminar organized by the Central Electricity Authority (CEA), SECI staff presented the tendering situation of energy storage systems, electricity price trends, and the agency's experience with energy storage projects under operation and construction.

According to CEA's briefing on the event, SECI emphasized that the tendered electricity prices for its solar + BESS projects had decreased from INR 6.99 per unit in August 2018 to INR 3.09 per unit in September last year. In a recent guest blog for Energy Storage News, Debmalya Sen, President of the India Energy Storage Alliance (IESA), elaborated on the transformative impact of three main types of energy storage tenders (including standalone ESS, solar + BESS, and Firm, Dispatchable Renewable Energy (FDRE)). According to him, SECI has so far conducted two rounds of tenders for solar + BESS projects, awarding 1,200 MW of solar PV and 1,200 MWh of BESS projects in March 2024, and 2,000 MW of solar PV and 4,000 MWh of BESS projects in August 2024. Despite these successes, tenders for solar + BESS projects in India are still in their early stages. As shown in the chart by IESA President Debmalya Sen, only 200 MW of solar PV and 200 MWh of BESS are currently in operation through solar + BESS tenders. Additionally, construction is underway for 1.2 GW of solar PV and 1.2 GWh of BESS projects, while another 3.4 GW of solar PV to 5.4 GWh of BESS projects have been awarded but not yet constructed, with the average project cycle lengthening. Some tendered projects have also been canceled, indicating that challenges may arise during the project advancement process.




SMM New Energy Industry Research Department







Cong Wang 021-51666838





Xiaodan Yu 021-20707870


Rui Ma 021-51595780

Disheng Feng 021-51666714

Yujun Liu 021-20707895

Yanlin Lü 021-20707875

Zhicheng Zhou 021-51666711

Haohan Zhang 021-51666752

Zihan Wang 021-51666914

Xiaoxuan Ren 021-20707866

Jie Wang 021-51595902

Yang Xu 021-51666760

Boling Chen 021-51666836

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
SMM Daily Review: On March 2, Spot Lithium Carbonate Price Fluctuated Upward
49 mins ago
SMM Daily Review: On March 2, Spot Lithium Carbonate Price Fluctuated Upward
Read More
SMM Daily Review: On March 2, Spot Lithium Carbonate Price Fluctuated Upward
SMM Daily Review: On March 2, Spot Lithium Carbonate Price Fluctuated Upward
[SMM Daily Review: Spot Lithium Carbonate Prices Fluctuate Upward on March 2] SMM's battery-grade lithium carbonate index price edged up compared to the previous working day. In terms of futures movement, the most-traded contract opened and surged to a high of 179,500 yuan/mt before fluctuating and pulling back, breaking below the 170,000 yuan/mt level, and then gradually stabilized and rebounded to consolidate around 172,000 yuan/mt. In the afternoon, prices edged up again, mainly fluctuating around 173,500 yuan/mt until the close. The open interest of the most-traded contract decreased by about 3,200 lots compared to the previous trading day. In terms of actual transactions, upstream lithium chemical plants maintained relatively firm quotes, with a weak willingness to sell spot orders. When futures prices dropped to 170,000 yuan/mt, some downstream material plants showed a slight recovery in purchase willingness, but most participants remained cautious, primarily adopting a wait-and-see approach. Overall, there were signs of a slight recovery in market inquiries and transactions.
49 mins ago
South Korea's Solivis Sulphide Solid Electrolyte Layout
1 hour ago
South Korea's Solivis Sulphide Solid Electrolyte Layout
Read More
South Korea's Solivis Sulphide Solid Electrolyte Layout
South Korea's Solivis Sulphide Solid Electrolyte Layout
South Korea's Solivis focuses on sulphide solid electrolytes. The core product has an ionic conductivity as high as 12 mS/cm, surpassing the level of liquid electrolytes. The world's largest mass production plant for sulphide electrolytes was completed in November 2025, with plans to expand capacity to 400 mt by 2027. It has already supplied to leading battery and automaker companies in South Korea and Japan, aiming to become the world's top solid electrolyte provider by 2030.
1 hour ago
New Energy Is No Longer Just a Transition Narrative, but a National Security Asset
4 hours ago
New Energy Is No Longer Just a Transition Narrative, but a National Security Asset
Read More
New Energy Is No Longer Just a Transition Narrative, but a National Security Asset
New Energy Is No Longer Just a Transition Narrative, but a National Security Asset
Against this backdrop, the value of energy storage and grid infrastructure becomes particularly prominent. If conflict persists, the core objective of energy systems will shift from cost optimization to systemic resilience. Distributed energy, microgrids, and storage possess an insurance-like function; their value becomes more visible under extreme conditions. Even if elevated raw material prices increase project costs, higher policy priority may provide long-term support.
4 hours ago
[SMM Analysis]India's SECI Issues Large-Scale Solar Plus ESS Tender - Shanghai Metals Market (SMM)