[SMM Analysis]India's SECI Issues Large-Scale Solar Plus ESS Tender

Published: Jun 29, 2025 15:36
Source: SMM
[SMM Analysis]On June 19, 2025, the Solar Energy Corporation of India (SECI) issued a Request for Selection (RfS) document, initiating a competitive tendering process. SECI, a government enterprise under the Ministry of New and Renewable Energy (MNRE) of India, aims to advance the National Solar Mission. Similar to other solar + ESS tenders previously organized by SECI, the successful developers will sign a 25-year Power Purchase Agreement (PPA) with SECI to undertake the projects under a Build-Own-Operate (BOO) model. SECI will subsequently sell the electricity generated by the projects to designated buying entities. The addition of Battery Energy Storage Systems (BESS) to the projects will enable power supply during peak periods.

On June 19, 2025, the Solar Energy Corporation of India (SECI) issued a Request for Selection (RfS) document, initiating a competitive tendering process. SECI, a government enterprise under the Ministry of New and Renewable Energy (MNRE) of India, aims to advance the National Solar Mission.

Similar to other solar + energy storage system (BESS) tenders previously organized by SECI, the successful developers will sign a 25-year Power Purchase Agreement (PPA) with SECI to carry out the projects under a Build-Own-Operate (BOO) model. SECI will then sell the electricity generated by the projects to designated buying entities. The addition of BESS to the projects will enable power supply during peak electricity consumption periods.

This means that the sellers will be required to deliver clean energy to the buyers during a 6-hour peak period each day, specifically from 6 PM to 9 AM the next morning. During each peak period selected by the buying entities, the batteries must have the capability to discharge continuously for 1 hour. Developers must be able to supply 3,000 kWh of electricity per megawatt alternating current (MWac) of installed solar PV capacity during the specified peak periods.

The pre-bid meeting for this tender is scheduled for July 10, 2025, and bidding will commence on August 21.

SECI's tenders, along with those of other government agencies in India and abroad, are considered to have driven the procurement process in India's emerging ESS sector. At a recent seminar organized by the Central Electricity Authority (CEA), SECI staff presented the tendering situation of energy storage systems, electricity price trends, and the agency's experience with energy storage projects under operation and construction.

According to CEA's briefing on the event, SECI emphasized that the tendered electricity prices for its solar + BESS projects had decreased from INR 6.99 per unit in August 2018 to INR 3.09 per unit in September last year. In a recent guest blog for Energy Storage News, Debmalya Sen, President of the India Energy Storage Alliance (IESA), elaborated on the transformative impact of three main types of energy storage tenders (including standalone ESS, solar + BESS, and Firm, Dispatchable Renewable Energy (FDRE)). According to him, SECI has so far conducted two rounds of tenders for solar + BESS projects, awarding 1,200 MW of solar PV and 1,200 MWh of BESS projects in March 2024, and 2,000 MW of solar PV and 4,000 MWh of BESS projects in August 2024. Despite these successes, tenders for solar + BESS projects in India are still in their early stages. As shown in the chart by IESA President Debmalya Sen, only 200 MW of solar PV and 200 MWh of BESS are currently in operation through solar + BESS tenders. Additionally, construction is underway for 1.2 GW of solar PV and 1.2 GWh of BESS projects, while another 3.4 GW of solar PV to 5.4 GWh of BESS projects have been awarded but not yet constructed, with the average project cycle lengthening. Some tendered projects have also been canceled, indicating that challenges may arise during the project advancement process.




SMM New Energy Industry Research Department







Cong Wang 021-51666838





Xiaodan Yu 021-20707870


Rui Ma 021-51595780

Disheng Feng 021-51666714

Yujun Liu 021-20707895

Yanlin Lü 021-20707875

Zhicheng Zhou 021-51666711

Haohan Zhang 021-51666752

Zihan Wang 021-51666914

Xiaoxuan Ren 021-20707866

Jie Wang 021-51595902

Yang Xu 021-51666760

Boling Chen 021-51666836

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
1 hour ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
1 hour ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
1 hour ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
1 hour ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
1 hour ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
1 hour ago