[A 100,000 mt technological transformation project for lithium-ion battery cathode material LFP precursor is here] Sichuan Yingda Lithium Battery New Materials Co., Ltd. has entrusted Sichuan Zhongcheng Hanlan Technology Co., Ltd. to conduct the environmental impact assessment for the 100,000 mt/year technological transformation project for lithium-ion battery cathode material LFP precursor. The assessment includes optimizing and adjusting the existing capacity of 40,000 mt of sodium-based iron phosphate and 60,000 mt of ammonium-based iron phosphate to 100,000 mt of ammonium-based iron phosphate, which will be constructed in three phases within Workshop 1 and Workshop 2. After the reconstruction, Workshop 1 will house Phase 1 (Production Line 1, with a capacity of 25,000 mt/year, which has already been accepted) and Phase 2 (Production Lines 2 and 3, with a combined capacity of 50,000 mt/year), totaling 75,000 mt in scale. Workshop 2 will house Phase 3 (Production Line 4), with a capacity of 25,000 mt.