NewsFlash / Minor Metals / Baomei Mine Corridor Project Successfully Completes Full-load Commissioning
Baomei Mine Corridor Project Successfully Completes Full-load Commissioning
iconJun 27, 2025 17:13
Source:SMM
[SMM Magnesium News] On June 19, the full-load commissioning of the belt system for the Anhui Baomei Mineral Products Conveyor Corridor Project (hereinafter referred to as the "Corridor Project") was successfully completed, indicating that the entire corridor system is now fully capable of stable and efficient operation, meeting the conditions for full-scale production, and opening up a "main artery" for the company's raw material transportation. The Corridor Project is one of the important supporting projects for the Anhui Baomei Light Alloy Project. Starting from the Garden Wujia Dolomite Mine in Youhua Town and ending at the Tongbu Logistics Park, the project has a total length of approximately 22.97 kilometers and consists of a closed elevated corridor and four tunnels, with a designed annual transportation capacity of 40 million mt. This project not only serves as a "main artery" connecting Baomei's raw material base with its production site but also acts as a "green corridor" for the transformation and upgrading of Qingyang County's mining economy. It is of great significance in reducing traffic pressure and dust pollution caused by vehicle transportation and achieving green transportation of mineral products.

For queries, please contact Lemon Zhao at lemonzhao@smm.cn

For more information on how to access our research reports, please email service.en@smm.cn

Related news

SMM Events & Webinars

All