Public Notice for Hunan Zhongke Shinzoom Co., Ltd.'s Lithium Battery Materials Project

Published: Jun 26, 2025 09:50
[Public Notice on the Integrated Production and Construction Project of Anode Materials for Lithium Batteries with an Annual Output of 100,000 mt by Hunan Zhongke Shinzoom Co., Ltd. in Southern China]

Project Name: Integrated Production and Construction Project of Anode Materials for Lithium Batteries with an Annual Output of 100,000 mt (Project to Be Constructed First and Then Inspected)

Construction Unit: Yunnan Zhongke Shinzoom Graphite Co., Ltd.

Project Location: Located to the west of Sanyuan Road and to the north of Huanbei Road in Qujing Economic and Technological Development Zone

Total Construction Area: 252,770.88㎡

Project Construction Contents: The main construction contents include planning 20 standalone buildings within the project site, including 8 workshops, 1 warehouse, 1 comprehensive building, 1 logistics service center, 1 shift dormitory building, 3 gatehouses, 1 hazardous waste and solid waste storage building (including a garbage station), 1 maintenance workshop, 1 GIS building, 1 comprehensive building for the power distribution room, and 1 garbage station.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
12 mins ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
12 mins ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
15 mins ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
15 mins ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
16 mins ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
16 mins ago