Tender for two items including cable reel

Published: Jun 25, 2025 11:29

Tender Announcement for Two Items Including Cable Reels

1. Tender Conditions

The bid inviter for this tender project, which involves two items including cable reels (PGPGFWHGZHD250624219326), is the Material Planning Department of the Procurement Center of Pangang Group Engineering & Technology Co., Ltd. The funds for this tender project are self-raised, and the project is now ready for tendering. A public tender is being conducted.

2. Project Overview and Tender Scope

2.1 Project Name: Two Items Including Cable Reels

2.2 Alternative Procurement Method if Tender Fails: Negotiated Procurement

2.3 For detailed information on the tender content, scope, and scale of this project, please refer to the attached "Material List Attachment.pdf".

3. Bidder Qualification Requirements

3.1 Consortium bidding is not allowed in this tender.

3.2 Bidders in this tender must meet the following qualification requirements:

(1) Circulation-type business license

(2) Production-type business license

3.3 Bidders in this tender must meet the following registered capital requirements:

Production-type registered capital: 2 million yuan or above

Circulation-type registered capital: 1 million yuan or above

3.4 Bidders in this tender must meet the following performance requirements:

Please refer to the attachment for details (if necessary).

3.5 Bidders in this tender must meet the following capability, financial, and other requirements:

Financial requirements: Production-type suppliers must have a registered capital of 2 million yuan or above, and circulation-type suppliers must have a registered capital of 1 million yuan or above.

Capability requirements: 1. Need to provide scanned copies of enterprise qualifications that have passed the annual inspection: (1) Business license (or duplicate); (2) Tax registration certificate (or duplicate) (except for those with a unified three-in-one certificate); (3) Organization code certificate (or duplicate) (except for those with a unified three-in-one certificate). 2. Performance requirements: None.

Other requirements: Please refer to the attachment for details (if necessary).

3.6 For projects that must be tendered according to the law, bids from dishonest persons subject to enforcement are invalid in this tender.

4. Acquisition of Tender Documents

4.1 Interested bidders are requested to log in to the Ansteel Smart Tendering Platform at http://bid.ansteel.cn from 08:45 on June 25, 2025, to 08:45 on July 16, 2025 (Beijing time, the same hereinafter) to download the electronic tender documents.

Click to view tender details:》Tender Announcement for Two Items Including Cable Reels

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Before the holiday, the black chain is unlikely to see a trend-driven market [SMM Steel Industry Chain Weekly Report].
Feb 6, 2026 18:30
Before the holiday, the black chain is unlikely to see a trend-driven market [SMM Steel Industry Chain Weekly Report].
Read More
Before the holiday, the black chain is unlikely to see a trend-driven market [SMM Steel Industry Chain Weekly Report].
Before the holiday, the black chain is unlikely to see a trend-driven market [SMM Steel Industry Chain Weekly Report].
This week, ferrous metals were in the doldrums, with coking coal and coke staging a mid-week rise. At the beginning of the week, financial markets experienced sharp fluctuations, dragging down sentiment in the ferrous chain and leading to a pullback in futures. Mid-week, Indonesia's cut to coke production quotas drove coking coal and coke futures to lead the gains, though the impact was more pronounced on thermal coal, while coking coal's rise was largely sentiment-driven and short-lived. In the latter part of the week, finished products continued their seasonal inventory buildup, and support from the raw material side weakened, causing the entire ferrous chain to pull back. In the spot market, with the Chinese New Year holiday approaching, purchasing activity slowed down further, with end-users only making limited, as-needed purchases at low prices.
Feb 6, 2026 18:30
MMi Daily Iron Ore Report (February 6)
Feb 6, 2026 18:09
MMi Daily Iron Ore Report (February 6)
Read More
MMi Daily Iron Ore Report (February 6)
MMi Daily Iron Ore Report (February 6)
Today, the DCE iron ore futures continued to hit bottom today, with the most-traded contract I2605 closing at 760.5 yuan/mt, down 1.23% from the previous trading day. Spot prices fell by 5–10 yuan/mt compared to the previous trading day.
Feb 6, 2026 18:09
[SMM Chromium Daily Review] Inquiries and Transactions Weakened, Chromium Market Showed Mediocre Performance Before the Holiday
Feb 6, 2026 17:41
[SMM Chromium Daily Review] Inquiries and Transactions Weakened, Chromium Market Showed Mediocre Performance Before the Holiday
Read More
[SMM Chromium Daily Review] Inquiries and Transactions Weakened, Chromium Market Showed Mediocre Performance Before the Holiday
[SMM Chromium Daily Review] Inquiries and Transactions Weakened, Chromium Market Showed Mediocre Performance Before the Holiday
[SMM Chrome Daily Review: Trading and Inquiries Weakened, Chrome Market Showed Mediocre Performance Before the Holiday] February 6, 2026: Today, the ex-factory price of high-carbon ferrochrome in Inner Mongolia was 8,500-8,600 yuan/mt (50% metal content), flat MoM from the previous trading day...
Feb 6, 2026 17:41