Tender for Steel Procurement for Annual Maintenance of Hydraulic and Lubrication System of 2150 Line in Hot Rolling Mill by the Hydraulic Team of the Electromechanical Company Over 25 Years

Published: Jun 25, 2025 11:26

1. ProcurementConditions

Thisprocurementprojectinvolves the annual maintenance steel materials for the hydraulic lubrication system of the 2150 line at the Hot Rolling Plant of the Hydraulic Team of the Electromechanical Company, 25th year (AGGZZBHGXHD250624219472). Theprocuringentity is the Tender Management Office of the Procurement Supply Center of Ansteel Group Engineering Technology Development Co., Ltd., withfunding sourced fromself-raised capital. The project has met theprocurementconditions and is now open forpublic inquiry and comparison.

2. Project Overview andProcurementScope

2.1 Project Name:Annual Maintenance Steel Materials for the Hydraulic Lubrication System of the 2150 Line at the Hot Rolling Plant of the Hydraulic Team of the Electromechanical Company, 25th Year

2.2 ProcurementFailure and Alternative Procurement Method:Switch to Negotiated Procurement

2.3 Theprocurementcontent, scope, and scale of this project are detailed in the attachment "Material List Attachment.pdf".

3. Bidder Qualification Requirements

3.1 Thisprocurementdoes not allowjoint venture bidding.

3.2 Thisprocurementrequires bidders to meet the following qualification requirements:

(1) Distribution-type business license

(2) Production-type business license

3.3 Thisprocurementrequires bidders to meet the following registered capital requirements:

Production-type registered capital: 500 (10,000 yuan) or above

Distribution-type registered capital: 500 (10,000 yuan) or above

3.4 Thisprocurementrequires bidders to meet the following performance requirements:

Within the time frame from 2024 to 2025, one copy of the steel material contract and corresponding invoice scan.

3.5 Thisprocurementrequires bidders to meet the following capability, financial, and other requirements:

Financial requirements: See the attachment (if required)

Capability requirements: Business license (or copy) scan; both producers and dealers are acceptable, with registered capital reaching 5 million yuan (RMB) (established for at least one year)

Other requirements: See the attachment (if required)

3.6 Thisprocurementrequires that for projects legally subject to tender, bids from discredited persons are invalid.

4. ProcurementDocument Acquisition

4.1 All interested bidders shall log in to the Ansteel Intelligent Tender and Bid Platform at http://bid.ansteel.cn between10:00 on June 25, 2025and13:00 on July 4, 2025(Beijing Time, the same hereinafter) to download electronicprocurementdocuments.

Click to view tender details:》Announcement for Steel Procurement of Annual Maintenance of Hydraulic Lubrication System for 2150 Line in Hot Rolling Plant by Mechanical & Electrical Company's Hydraulic Team in 2025

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Before the holiday, the black chain is unlikely to see a trend-driven market [SMM Steel Industry Chain Weekly Report].
Feb 6, 2026 18:30
Before the holiday, the black chain is unlikely to see a trend-driven market [SMM Steel Industry Chain Weekly Report].
Read More
Before the holiday, the black chain is unlikely to see a trend-driven market [SMM Steel Industry Chain Weekly Report].
Before the holiday, the black chain is unlikely to see a trend-driven market [SMM Steel Industry Chain Weekly Report].
This week, ferrous metals were in the doldrums, with coking coal and coke staging a mid-week rise. At the beginning of the week, financial markets experienced sharp fluctuations, dragging down sentiment in the ferrous chain and leading to a pullback in futures. Mid-week, Indonesia's cut to coke production quotas drove coking coal and coke futures to lead the gains, though the impact was more pronounced on thermal coal, while coking coal's rise was largely sentiment-driven and short-lived. In the latter part of the week, finished products continued their seasonal inventory buildup, and support from the raw material side weakened, causing the entire ferrous chain to pull back. In the spot market, with the Chinese New Year holiday approaching, purchasing activity slowed down further, with end-users only making limited, as-needed purchases at low prices.
Feb 6, 2026 18:30
MMi Daily Iron Ore Report (February 6)
Feb 6, 2026 18:09
MMi Daily Iron Ore Report (February 6)
Read More
MMi Daily Iron Ore Report (February 6)
MMi Daily Iron Ore Report (February 6)
Today, the DCE iron ore futures continued to hit bottom today, with the most-traded contract I2605 closing at 760.5 yuan/mt, down 1.23% from the previous trading day. Spot prices fell by 5–10 yuan/mt compared to the previous trading day.
Feb 6, 2026 18:09
[SMM Chromium Daily Review] Inquiries and Transactions Weakened, Chromium Market Showed Mediocre Performance Before the Holiday
Feb 6, 2026 17:41
[SMM Chromium Daily Review] Inquiries and Transactions Weakened, Chromium Market Showed Mediocre Performance Before the Holiday
Read More
[SMM Chromium Daily Review] Inquiries and Transactions Weakened, Chromium Market Showed Mediocre Performance Before the Holiday
[SMM Chromium Daily Review] Inquiries and Transactions Weakened, Chromium Market Showed Mediocre Performance Before the Holiday
[SMM Chrome Daily Review: Trading and Inquiries Weakened, Chrome Market Showed Mediocre Performance Before the Holiday] February 6, 2026: Today, the ex-factory price of high-carbon ferrochrome in Inner Mongolia was 8,500-8,600 yuan/mt (50% metal content), flat MoM from the previous trading day...
Feb 6, 2026 17:41