China EV battery installations in May: CATL share at 42.87%, BYD 22.49%

Published: Jun 23, 2025 16:53
CATL (SHE: 300750) saw its market share in China's electric vehicle (EV) battery market rise compared to the previous month, while BYD (HKG: 1211, OTCMKTS: BYDDY) saw a decline.

CATL (SHE: 300750) saw its market share in China's electric vehicle (EV) battery market rise compared to the previous month, while BYD (HKG: 1211, OTCMKTS: BYDDY) saw a decline.

In May, China's power battery installation volume reached 57.1 GWh, up 43.1 percent year-on-year and up 5.5 percent month-on-month, according to data released today by the China Automotive Battery Innovation Alliance (CABIA).

China EV battery installations in May: CATL share at 42.87%, BYD 22.49%

CATL's battery installations in May reached 24.47 GWh, maintaining its top position with a 42.87 percent market share, up 3.44 percentage points from April's 39.44 percent share.

BYD's battery installations in May totaled 12.84 GWh, accounting for a 22.49 percent market share, ranking second despite a decrease of 3.86 percentage points from April's 26.35 percent share.

CALB's battery installations in May reached 4.30 GWh, accounting for a 7.53 percent market share, up 0.51 percentage points from April's 7.02 percent.

Gotion High-tech ranked fourth in May with 3.00 GWh of battery pack installations and a 5.26 percent market share.

Sunwoda ranked fifth in May with an installation volume of 2.24 GWh and a market share of 3.93 percent.

China EV battery installations in May: CATL share at 42.87%, BYD 22.49%

China's ternary lithium battery installation volume in May was 10.5 GWh, accounting for 18.4 percent of the total installation volume. This represents a year-on-year increase of 1.6 percent and a month-on-month increase of 13.1 percent.

Lithium iron phosphate (LFP) batteries had an installation volume of 46.5 GWh in May, accounting for 81.6 percent of the total. This represents a year-on-year increase of 57.7 percent and a month-on-month increase of 3.9 percent.

CATL, CALB, and LG Energy Solution were the top three in ternary battery installations in May, with market shares of 73.11 percent, 11.43 percent, and 6.46 percent, respectively.

China EV battery installations in May: CATL share at 42.87%, BYD 22.49%

In the LFP battery market, CATL, BYD, and CALB had the highest installation volumes in May, with market shares of 36.05 percent, 27.58 percent, and 6.66 percent, respectively.

China EV battery installations in May: CATL share at 42.87%, BYD 22.49%

China's production of power batteries and other batteries in May reached 123.5 GWh, representing a year-on-year increase of 47.9 percent and a month-on-month increase of 4.4 percent.

China EV battery installations in May: CATL share at 42.87%, BYD 22.49%

The production of ternary batteries in May was 27.2 GWh, up 21.7 percent year-on-year and up 16.0 percent month-on-month.

China EV battery installations in May: CATL share at 42.87%, BYD 22.49%

The production of LFP batteries in May was 96.1 GWh, up 57.7 percent year-on-year and up 1.6 percent month-on-month.

China exported 13.5 GWh of power batteries in May, including 7.27 GWh of ternary batteries and 6.2 GWh of LFP batteries.

China EV battery installations in May: CATL share at 42.87%, BYD 22.49%

China EV battery installations in May: CATL share at 42.87%, BYD 22.49%

Source: https://cnevpost.com/2025/06/11/china-ev-battery-installations-may-2025/

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
7 hours ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
7 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
7 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
7 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
7 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
7 hours ago