【SMM Analysis】Recycling Industry Events This Week (Jun. 16-20)

Published: Jun 20, 2025 17:11
【SMM Analysis】Recycling Industry Events This Week (Jun. 16-20): This week's recycling industry events.

This week's recycling industry events.


50,000-Ton Lithium Battery Recycling Project Potentially Lands in Chongqing
Recently, the Development and Reform Commission platform of Qijiang District, Chongqing, announced the acceptance of a new energy vehicle battery recycling and comprehensive utilization project. The project will comprehensively process 50,000 tons of retired lithium batteries, including 10,000 tons of waste ternary lithium batteries and 40,000 tons of waste lithium iron phosphate batteries. After processing, outputs will include 12,000 tons of lithium batteries, 3,336 tons of lithium carbonate, 1,954.25 tons of manganese sulfate, 2,157.21 tons of cobalt sulfate, 5,052.07 tons of nickel sulfate, and 7,140.33 tons of sodium sulfate.

3,000-Ton Lithium Battery Project Announced
On June 18, a company announced plans to build a "3,000-ton/year lithium battery new materials project" in Linwu County, with a total investment of RMB 1 billion. The project will be implemented in three phases: Phase I focuses on R&D breakthroughs (completed by 2025); Phase II constructs a 1,000-ton/year production line (construction starts April 2026, operation by end-2027); Phase III adds a 2,000-ton/year line (construction starts June 2027, operation by end-2028).

20,000-Ton Lithium Hexafluorophosphate Project Operational
A 2,000-ton/year lithium hexafluorophosphate project (Phase I) recently commenced production in Zhejiang. The full project, with a total investment of RMB 5.18 billion, will ultimately produce 20,000 tons/year of lithium hexafluorophosphate, 5,000 tons/year of lithium bis(fluorosulfonyl)imide, 2,000 tons/year of vinylene carbonate, and 50,000 tons/year of lithium battery electrolyte, alongside byproducts. Phase II will cover remaining capacities.

50,000-Ton Recycling Project Nears Trial Production
The first production line of Phase I of a 50,000-ton/year lithium iron phosphate cathode material project is preparing for trial runs in Hubei. With a total investment of RMB 2 billion, the project will process waste lithium batteries and regenerate battery materials. Phase I includes a 25,000-ton/year production line.

15,000-Ton Lithium Battery Recycling Project Launched in Meizhou
A 15,000-ton/year waste lithium battery disassembly and recycling project recently passed environmental review in Guangdong. The project, with an investment of RMB 130 million, will physically separate lithium-ion battery materials through crushing and sorting.

New Recycling Industrial Base Breaks Ground
On June 10, a new renewable resource recycling industrial base and energy storage manufacturing base broke ground in Guangdong. The recycling base, with an investment of RMB 1.7 billion, will adopt robotic automation and proprietary safety platforms. Phase I covers 30 acres.

40,000-Ton LMFP Project Advances
A 40,000-ton/year lithium manganese iron phosphate (LMFP) project in Hunan is accelerating construction and is expected to begin production by late June. The project represents an investment of RMB 350 million.

15,000-Ton Waste Battery Project in Anhui
A green intelligent waste lithium battery processing project was announced in Anhui. Upon completion, it will handle 5,000 tons/year of waste lithium batteries and 10,000 tons/year of waste lithium electrode sheets.

50,000-Ton Battery Echelon Utilization Project Launched
A project in Anhui to annually recycle 50,000 tons of retired power batteries and produce 500 energy storage containers passed environmental review. The RMB 120 million project includes smart warehousing and traceability systems.

10,000-Ton Waste Lithium Battery Project in Xining
An electrolytic aluminum hazardous waste utilization project in Qinghai entered its second environmental review phase. The RMB 220 million project will process 80,000 tons/year of waste and produce lithium carbonate, graphite powder, and other materials.



Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
7 hours ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
7 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
7 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
7 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
7 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
7 hours ago