【SMM Analysis】Ghana's First Lithium Mine Development Sparks Tax Concession Debate

Published: Jun 20, 2025 19:37
The dispute centers on two key demands from Atlantic Lithium’s Ghanaian subsidiary, Barari DV: slashing royalty rates from 10% to 5% and revising corporate tax terms. The company argues that plunging lithium prices have slashed its post-tax return rate from an initial projection of 94% to just 13.6%. However, NRGI’s independent analysis suggests the project could still yield a 28% return even at current prices.

As Ghana prepares to develop its first lithium mine at Ewoyaa, a heated debate over tax concessions for Atlantic Lithium has intensified, raising concerns about long-term revenue protection. The Natural Resource Governance Institute (NRGI) has warned that permanent fiscal breaks could shortchange Ghana if lithium prices rebound, urging Parliament to scrutinize the company’s revised feasibility claims before approving the mining lease.

The dispute centers on two key demands from Atlantic Lithium’s Ghanaian subsidiary, Barari DV: slashing royalty rates from 10% to 5% and revising corporate tax terms. The company argues that plunging lithium prices have slashed its post-tax return rate from an initial projection of 94% to just 13.6%. However, NRGI’s independent analysis suggests the project could still yield a 28% return even at current prices.

"This is a critical moment for caution," said an NRGI economic analyst. "Spodumene prices could rebound to $1,264 per tonne by 2028—nearly double today’s lows. Locking in permanent tax cuts now would cost Ghana future price windfalls." The institute recommends adopting price-linked tax mechanisms instead of fixed concessions, alongside anti-tax avoidance clauses and stronger local benefit safeguards.

The negotiations have been delayed due to Ghana’s government transition, which NRGI sees as an opportunity to rebalance investor and national interests. The Ewoyaa lithium mine, a test case for the country’s strategic mineral development, could set a precedent for managing future critical mineral projects. Ghana’s parliamentary mining committee has already requested additional cost breakdowns from the company, stressing that "fair returns for citizens from non-renewable resources must be guaranteed."

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
3 hours ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
3 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
3 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
3 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
3 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
3 hours ago
【SMM Analysis】Ghana's First Lithium Mine Development Sparks Tax Concession Debate - Shanghai Metals Market (SMM)