The project is located in Heze, Shandong Province. The total planned investment for the entire upstream and downstream industry chain is RMB 13 billion. It will establish an intelligent manufacturing base for LFP ESS batteries, a production line for PACK and energy storage system integration, a new material production site, and an upstream raw material production site. Upon completion, it will form a dual closed-loop system: an energy industry chain encompassing "generation, transmission, distribution, and utilization," and a complete battery industry chain spanning from materials to recycling.