Total Investment of 2.1 Billion Yuan! Lithium Carbonate Project with Annual Output of 15,000 mt Lands in Ganzhou, Jiangxi

Published: Jun 18, 2025 08:45
Recently, the Administrative Approval Bureau of Ganzhou City issued a public notice on administrative approval applications, announcing that the environmental impact assessment (EIA) for the 15,000 mt/year lithium carbonate project (re-application) of Jiangxi Xiangnan New Energy Co., Ltd. has been approved. It is reported that the project is located in the Xinhua Industrial Zone of Dayu Industrial Park, Jiangxi Province, with a total investment of 2.1 billion yuan, including 25 million yuan for environmental protection, accounting for 1.19% of the total investment. The main investments in this project include 90 million yuan for equipment, 50 million yuan for working capital, and 70 million yuan for other purposes (including environmental protection investment). The main product is 15,000 mt/year of battery-grade lithium carbonate, with a by-product of 73,483.25 mt/year of sodium sulfate decahydrate.

江西湘南新能源有限公司年产15,000吨碳酸锂项目(重新报批)环评获批

Recently, the Administrative Approval Bureau of Ganzhou City issued a public notice on administrative approval applications, announcing that the environmental impact assessment (EIA) for the 15,000 mt/year lithium carbonate production project (re-application) of Jiangxi Xiangnan New Energy Co., Ltd. has been approved.

It is reported that the project is located in the Xinhua Industrial Zone of Dayu Industrial Park, Jiangxi Province, with a total investment of 2.1 billion yuan, including 25 million yuan for environmental protection, accounting for 1.19% of the total investment. The main investments in this project include 90 million yuan for equipment, 50 million yuan for working capital, and 70 million yuan for other purposes (including environmental protection investment). The main product is 15,000 mt/year of battery-grade lithium carbonate, with a by-product of 73,483.25 mt/year of sodium sulfate decahydrate.

According to the construction plan, the main part of the project involves leasing the roasting production area, the grinding and brine workshop, battery-grade lithium carbonate workshops 102, 107-2, and 108, as well as storage facilities including raw material warehouses 1-3# and finished product warehouses 1-2#. Public and auxiliary facilities include office buildings, a life service center, a machine repair workshop, a power distribution room, an expert building (including a laboratory), a guard room, and dormitories. New environmental protection facilities will be constructed, including waste gas treatment facilities, wastewater treatment facilities (a sewage treatment workshop), noise control facilities, temporary solid waste storage facilities, initial rainwater ponds, and emergency response ponds.

According to available information, Jiangxi Xiangnan New Energy Co., Ltd. was established on July 15, 2022, and is jointly held by Hunan Zhuoguang Power Sales and Distribution Co., Ltd. and Hunan Xiangnian New Energy Co., Ltd. As a high-tech enterprise focusing on lithium carbonate production, Xiangnan New Energy relies on technological innovation and green production processes, occupying an important position in the field of new energy materials. Its products are widely used in power batteries, energy storage systems (ESS), and other fields, providing strong momentum for the development of the regional new energy industry chain.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
19 hours ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
19 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
19 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
19 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
19 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
19 hours ago