Thailand BOI Rolls Out Four Measures to Ease U.S. Tariff Pressure

Published: Jun 9, 2025 10:37
On May 19, Thailand’s BOI introduced four measures to support local firms facing U.S. tariffs.

On May 19, Thailand’s BOI introduced four measures to support local firms facing U.S. tariffs. First, investment incentives will be suspended for oversupplied or trade-sensitive sectors, including solar panels, non-essential auto parts (e.g., lead-acid batteries), metal cutting, non-recycling waste sorting outside industrial zones, and downstream steel products such as long steel, hot-rolled coils, and thick plates.

Second, industries likely affected by U.S. trade actions—like auto parts, electronics, and metal goods—must meet stricter local processing requirements. Products must undergo significant transformation in Thailand to boost export acceptance and protect national interests.

Third, new labor rules require manufacturing firms with over 100 employees to hire at least 70% Thai staff. Foreign workers must meet salary thresholds: THB 150,000/month for executives and THB 50,000 for specialists. SMEs hit by tariffs will get extended tax breaks: from 3 years (max 50% of investment) to 5 years (max 100%), encouraging upgrades in automation and sustainability.

Source: https://hq.smm.cn/photovoltaic/list/12644

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
[SMM PV News] Waaree Breaks Ground on India's Largest 10 GW Ingot and Wafer Plant
19 hours ago
[SMM PV News] Waaree Breaks Ground on India's Largest 10 GW Ingot and Wafer Plant
Read More
[SMM PV News] Waaree Breaks Ground on India's Largest 10 GW Ingot and Wafer Plant
[SMM PV News] Waaree Breaks Ground on India's Largest 10 GW Ingot and Wafer Plant
Waaree Energies has commenced construction on a 10 GW integrated solar ingot and wafer manufacturing facility in Nagpur, Maharashtra. Spanning 300 acres with an investment of roughly INR 62 billion, the project is billed as India's largest of its kind. The facility aims to strengthen the domestic upstream solar supply chain, reduce import reliance under the 'Atmanirbhar Bharat' vision, and generate over 8,000 jobs. This upstream expansion strategically complements Waaree's existing 22.3 GW module and 5.4 GW cell manufacturing capacities.
19 hours ago
Module Prices Eased Slightly, Polysilicon Prices Temporarily Remained Stable [SMM Silicon-Based PV Morning Meeting Minutes]
Mar 16, 2026 09:36
Module Prices Eased Slightly, Polysilicon Prices Temporarily Remained Stable [SMM Silicon-Based PV Morning Meeting Minutes]
Read More
Module Prices Eased Slightly, Polysilicon Prices Temporarily Remained Stable [SMM Silicon-Based PV Morning Meeting Minutes]
Module Prices Eased Slightly, Polysilicon Prices Temporarily Remained Stable [SMM Silicon-Based PV Morning Meeting Minutes]
[SMM Silicon-Based PV Morning Meeting Summary: Module Prices Have Softened Somewhat, While Polysilicon Prices Remain Temporarily Stable] Recently, transaction prices for modules in China have softened somewhat. As demand outside China declines and domestic projects are at the point of being about to start, module enterprises have shown differing attitudes in their quotations. Some enterprises have begun offering concessions in advance to take orders, and distributors have also recently started shipments at low prices, thereby leading to a decline in the market transaction price center. At present, quoted prices for distributed Topcon183, 210R, and 210N high-efficiency modules are 0.752 Yuan/W, 0.767 Yuan/W, and 0.77 Yuan/W, respectively, while quoted prices for centralized Topcon182/183 and 210N high-efficiency modules are 0.727 Yuan/W and 0747 Yuan/W, respectively.
Mar 16, 2026 09:36
[SMM PV News] Bahrain Shortlists ACWA Power and Yellow Door Energy for 100 MW Solar Project
Mar 16, 2026 09:24
[SMM PV News] Bahrain Shortlists ACWA Power and Yellow Door Energy for 100 MW Solar Project
Read More
[SMM PV News] Bahrain Shortlists ACWA Power and Yellow Door Energy for 100 MW Solar Project
[SMM PV News] Bahrain Shortlists ACWA Power and Yellow Door Energy for 100 MW Solar Project
Bahrain's Electricity and Water Authority (EWA) has shortlisted Saudi Arabia's ACWA Power and UAE's Yellow Door Energy for a 100 MW solar plant in Bilaj Al Jazayer. Developed under a public-private partnership ('PPP') on a build-own-operate ('BOO') model, the project targets a commercial operation date of September 30, 2027. This initiative supports Bahrain's broader goals to reach 255 MW of solar capacity by 2025 and 700 MW of total renewable capacity by 2030, significantly expanding upon its modest 66 MW of installed PV at the end of 2024.
Mar 16, 2026 09:24
Thailand BOI Rolls Out Four Measures to Ease U.S. Tariff Pressure - Shanghai Metals Market (SMM)