Ministry of Commerce Addresses "Cutthroat" Competition in Auto Industry: Plans for Comprehensive Rectification and Compliance Guidance

Published: Jun 6, 2025 18:29
【Ministry of Commerce Responds to "Cutthroat" Competition in the Auto Industry: Strengthening Comprehensive Rectification and Compliance Guidance】On June 5, the Ministry of Commerce held a regular press conference, where spokesperson He Yongqian introduced the key work in the field of commerce recently. When asked about the auto industry, He said that recently, relevant departments of the Ministry of Commerce have organized associations, research institutions, and related enterprises for discussions to listen to opinions and suggestions and to study further work on auto consumption. Moving forward, the Ministry of Commerce will work with other departments to continue to strengthen market tracking, research, and policy guidance in the auto consumption sector. They aim to break through the bottlenecks and difficulties in auto circulation and consumption to better meet residents' diverse and personalized consumption needs. In response to the current "cutthroat" competition in the auto industry, the Ministry of Commerce will actively cooperate with relevant departments to strengthen comprehensive rectification and compliance guidance to maintain a fair competitive market order and promote the healthy development of the industry.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
11 mins ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
11 mins ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
15 mins ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
15 mins ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
15 mins ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
15 mins ago