Great Wall Motor Unveils Patent for Human-Machine Co-Driving to Resolve Steering Wheel Conflicts

Published: Jun 6, 2025 17:42
[Great Wall Motor Unveils Patent for Human-Machine Co-Driving, Addressing Steering Wheel Conflicts Between Intelligent Driving System and Driver] On June 3, the patent for "Human-Machine Co-Driving Control Method, Device, and Vehicle" applied for by Great Wall Motor Company Limited was published. The abstract indicates that this disclosure pertains to the field of assisted driving technology. By predicting the user's takeover intention based on steering wheel control parameters, a corresponding intelligent driving control coefficient is obtained. This coefficient is then incorporated into generating the target control parameters that ultimately control the vehicle's steering system, ensuring that the control degree of the intelligent driving steering request parameters output by the intelligent driving system aligns with the user's takeover intention. This addresses the issue of conflicts between the intelligent driving system and the driver over the steering wheel, while also considering safety, comfort, and compliance. By integrating the coordination between the upper and lower computers, intelligent torque distribution for human-machine co-driving is achieved, enhancing the flexibility of intelligent driving.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
5 hours ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
5 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
5 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
5 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
5 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
5 hours ago
[Great Wall Motor Unveils Patent for Human-Machine Co-Driving, Address - Shanghai Metals Market (SMM)