Lithium Carbonate Prices Face Risk of Falling to 50,000 yuan/mt before 2026

Published: Jun 4, 2025 09:59
On May 26, lithium carbonate futures contract briefly fell to 59,920 yuan/mt; on May 27, it further dropped to 59,720 yuan/mt, though it closed at 60,920 yuan/mt, the 60,000 yuan/mt threshold had been breached twice.

On May 26, lithium carbonate futures contract briefly fell to 59,920 yuan/mt; on May 27, it further dropped to 59,720 yuan/mt, though it closed at 60,920 yuan/mt, the 60,000 yuan/mt threshold had been breached twice.

In the spot market, the spot price of battery-grade lithium carbonate fell to 61,950 yuan/mt on May 26, a decline of over 10% from the beginning of May.

Data indicates that the global lithium industry is expected to face a supply surplus of 265,000 mt and 207,000 mt LCE in 2025 and 2026, respectively, primarily due to the concentrated release of capacity stimulated by high lithium prices. Additionally, as of May 15, the spot inventory of lithium carbonate reached 132,000 mt, with smelter inventory accounting for over 50%, creating sustained selling pressure.

Some analysts believe that the growth in end-use demand for NEVs has not been effectively transmitted to the lithium chemicals sector, leading to inventory backlogs at downstream battery makers and automakers, and weak purchase willingness.

On the cost side, domestic and overseas lithium ore prices have continued to weaken, while salt lake capacity has been seasonally released, weakening the cost support for lithium chemicals production. The operating rate of spodumene production lines has declined (from a daily average of 1,400 mt to 1,200 mt), but the increased output from salt lake lithium extraction has offset the impact of production cuts.

Regarding future trends, the market expects lithium carbonate prices to fluctuate between 58,000 yuan/mt and 65,000 yuan/mt within the next 1-3 months, and potentially fall to 50,000 yuan/mt before 2026.

Please note that this news is sourced from https://libattery.ofweek.com/2025-05/ART-36002-8120-30663751.html and translated by SMM.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
16 hours ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
16 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
16 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
16 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
16 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
16 hours ago