Huansheng, DAS solar, and Gepu Solar Energy Shortlisted! Candidates for the 364.6 MW Module Procurement Project in Mulei, Xinjiang Announced

Published: May 30, 2025 13:33
On May 28, the candidates for the PV module procurement tender of the Mulei 300,000 kW PV project of Xinjiang New Energy Research Institute Co., Ltd. were announced. The first-ranked winning candidate was Huansheng PV (Jiangsu) Co., Ltd., the second-ranked winning candidate was DAS Solar New Energy Technology Co., Ltd., and the third-ranked winning candidate was Zhejiang GePu Solar Energy Technology Co., Ltd.

On May 28, the candidates for the PV module procurement tender for the 300,000 kW PV project of Xinjiang New Energy Research Institute Co., Ltd. in Mulei were announced. The first-ranked winning candidate was Huansheng PV (Jiangsu) Co., Ltd., the second-ranked winning candidate was DAS Solar New Energy Technology Co., Ltd., and the third-ranked winning candidate was Zhejiang GePu Solar Energy Technology Co., Ltd.

The tender announcement indicated that this tender project includes, but is not limited to, the supply of monocrystalline silicon bifacial PV modules (N-type modules, with a single-piece peak power of 580 Wp or above) with a capacity of 364.6022 MWp, as well as their ancillary equipment (including junction box module connecting wires, MC4-compatible plug connectors, special tools, spare parts, etc.), related technical services, a 12-year equipment warranty service, and a 30-year peak power guarantee.

Planned supply schedule: 50 MWp of PV modules to arrive before June 30, 2025; 150 MWp of PV modules to arrive before July 30, 2025; and all PV modules to arrive before August 30, 2025 (the specific delivery date shall be subject to the written notice from the bid inviter).

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
China Approves 17.44 GW Power Plan for Qaidam Desert Base, Including Solar, Wind, and Energy Storage Projects
17 hours ago
China Approves 17.44 GW Power Plan for Qaidam Desert Base, Including Solar, Wind, and Energy Storage Projects
Read More
China Approves 17.44 GW Power Plan for Qaidam Desert Base, Including Solar, Wind, and Energy Storage Projects
China Approves 17.44 GW Power Plan for Qaidam Desert Base, Including Solar, Wind, and Energy Storage Projects
It is understood that the National Energy Administration has officially approved the power source allocation plan for the "Qaidam Desert Base (East Golmud) Base". The planned construction scale of the power source projects at this base is 17.44 million kilowatts, including 10 million kilowatts of photovoltaic power, 5 million kilowatts of wind power, 2.64 million kilowatts of coal-fired power, 0.1 million kilowatts of solar thermal power, and 1.5 million kilowatts (for 4 hours) of electrochemical energy storage. The total investment in the projects is about 86 billion yuan. The new energy will be transmitted to Guangxi through the "Qinghai-Guangxi DC" UHV power transmission project. Currently, significant progress has been made in the preliminary work of the "Qinghai-Guangxi DC" project, w
17 hours ago
[SMM PV News] Armenia Hits 1.1 GW Solar Capacity,
Feb 6, 2026 09:17
[SMM PV News] Armenia Hits 1.1 GW Solar Capacity,
Read More
[SMM PV News] Armenia Hits 1.1 GW Solar Capacity,
[SMM PV News] Armenia Hits 1.1 GW Solar Capacity,
Armenia’s cumulative solar capacity has surged to 1.1 GW following the addition of approximately 615 MW in 2025. This rapid expansion has pushed solar's share of electricity generation to around 15%, effectively meeting the country's 2030 target years ahead of schedule. The growth is heavily driven by a net-metering scheme supporting over 50,000 autonomous producers (totaling 650 MW), though the government ended loan subsidies for rooftop solar in July to shift focus toward battery storage.
Feb 6, 2026 09:17
Spot Market and Domestic Inventory Brief Review (February 5, 2026) [SMM Silver Market Weekly Review]
Feb 5, 2026 17:36
Spot Market and Domestic Inventory Brief Review (February 5, 2026) [SMM Silver Market Weekly Review]
Read More
Spot Market and Domestic Inventory Brief Review (February 5, 2026) [SMM Silver Market Weekly Review]
Spot Market and Domestic Inventory Brief Review (February 5, 2026) [SMM Silver Market Weekly Review]
Feb 5, 2026 17:36