China Energy Engineering Corporation Limited (03996.HK) announced that recently, its subsidiary, China Power Engineering Consulting Group North-west Electric Power Design Institute Co., Ltd. (the consortium leader) formed a consortium with China Energy Engineering Group Hunan Electric Power Design Institute Co., Ltd. and won the bid for the 6×660,000 kW coal-fired power project (EPC) in the Bingzhun Industrial Park of the China-Kazakhstan Horgos International Border Cooperation Center (the "Project"). The bid amount is approximately RMB 14.586 billion. The construction of the Project includes six 660,000 kW ultra-supercritical coal-fired generating units, as well as the simultaneous construction of environmental protection facilities such as desulfurization, denitrification, and dust removal. The total construction period is approximately 36.5 months.