Salt Lake Industry Co., Ltd. Applies to Syndicate for Loan of No More Than 1.8 Billion Yuan to Boost Annual Production of 40,000 mt Lithium Chemicals Project

Published: May 30, 2025 08:56
Recently, Salt Lake Potash Co., Ltd. (000792) announced that it plans to apply for a project loan of no more than 1.8 billion yuan from a banking consortium composed of five financial institutions, with a loan term of two years. This move aims to accelerate the construction of the 40,000 mt/year integrated basic lithium chemicals project, and meets the conditions for the central government's equipment renewal loan interest subsidy. The company can enjoy a 1.5% interest subsidy annually, thereby reducing financing costs.

Recently, Salt Lake Potash Co., Ltd. (000792) announced that it plans to apply for a project loan of no more than 1.8 billion yuan from a banking syndicate composed of five financial institutions, with a loan term of two years. This move aims to accelerate the construction of the 40,000 mt/year integrated basic lithium chemicals project and meets the conditions for the central government's equipment renewal loan interest subsidy. The company can enjoy a 1.5% interest subsidy annually, reducing financing costs.

According to the announcement, among the loan quota, Industrial and Commercial Bank of China Golmud Branch committed 500 million yuan, China Development Bank Qinghai Branch 400 million yuan, Bank of China Golmud Branch 300 million yuan, Agricultural Bank of China Golmud Branch 300 million yuan, and Bank of Communications Qinghai Branch 300 million yuan.

Data shows that Salt Lake Potash Co., Ltd.'s 40,000 mt/year integrated basic lithium chemicals project commenced construction in June 2023, specifically comprising a 20,000 mt/year battery-grade lithium carbonate project and a 20,000 mt/year lithium chloride project, with a total investment of approximately 7.098 billion yuan.

Recently, Salt Lake Potash Co., Ltd. stated at its 2024 annual performance exchange meeting that, with strong support from China Minmetals and China Salt Lake, the construction of the new 40,000 mt lithium chemicals project is being comprehensively accelerated and improved in quality. According to the plan, the 40,000 mt project will produce 3,000 mt of lithium carbonate this year, striving to achieve further breakthroughs in production.

In terms of performance, in 2024, Salt Lake Potash Co., Ltd. achieved operating revenue of 15.134 billion yuan, net profit of 4.663 billion yuan, and net profit excluding non-recurring gains and losses of 4.401 billion yuan. As of year-end 2024, its net assets were 36.575 billion yuan, up 14.63% YoY.

Data shows that in 2024, Salt Lake Potash Co., Ltd. produced 4.96 million mt of potassium chloride and 40,000 mt of lithium carbonate, and sold 4.6728 million mt of potassium chloride and 41,600 mt of lithium carbonate. Affected by the price declines of its two main products, potassium chloride and lithium carbonate, in 2024, the company's operating performance was under pressure. However, through continuous efforts in technological innovation, process optimization, and measurement control, it ensured the stability of its main businesses, fully leveraging the role of potash fertilizer as a "ballast stone" and the new energy industry as a "stabilizer."

In Q1 2025, Salt Lake Potash Co., Ltd.'s revenue was 3.119 billion yuan, up 14.5% YoY, and its net profit attributable to shareholders was 1.145 billion yuan, up 22.52% YoY.

In Q1, the production and sales of Salt Lake Potash Co., Ltd.'s core products, potassium chloride and lithium carbonate, remained stable. Potassium chloride production was approximately 964,900 mt, and sales were approximately 891,100 mt. Lithium carbonate production was approximately 8,514 mt, and sales were approximately 8,124 mt. Among them, potassium chloride, as one of the company's main revenue sources, saw a significant increase in market prices due to factors such as market supply and demand, thereby driving the company's performance growth compared to the same period last year.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
20 hours ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
20 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
20 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
20 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
20 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
20 hours ago