Tender for Copper Busbar Procurement for Power Distribution System of Angang Guangzhou Automotive Steel CGL2 Project

Published: May 27, 2025 11:24

Procurement Announcement for Copper Busbar Procurement for the Power Distribution System of Ansteel Guangzhou Automotive Steel CGL2 Project

1. Procurement Conditions

The procurer of this procurement project, Copper Busbar Procurement for the Power Distribution System of Ansteel Guangzhou Automotive Steel CGL2 Project (AGAGSZHGXHD250526212669), is the Centralised Procurement Platform of the Marketing Center of Ansteel Digital Intelligence Technology (Liaoning) Co., Ltd. The funds for this procurement project are self-raised. The project now meets the procurement conditions and is open for public inquiry and comparison.

2. Project Overview and Procurement Scope

2.1 Project Name: Copper Busbar Procurement for the Power Distribution System of Ansteel Guangzhou Automotive Steel CGL2 Project

2.2 Alternative Procurement Methods in Case of Failed Procurement: Transition to negotiation procurement or direct procurement

2.3 For details on the procurement content, scope, and scale of this project, please refer to the attached "Material List Attachment.pdf".

3. Bidder Qualification Requirements

3.1 Joint bidding is not allowed for this procurement.

3.2 Bidders for this procurement must meet the following qualification requirements:

(1) Production-oriented business license

(2) Circulation-oriented business license

3.3 Bidders for this procurement must meet the following registered capital requirements:

Registered capital for production-oriented enterprises: 1,000,000 yuan or above

Registered capital for circulation-oriented enterprises: 1,000,000 yuan or above

3.4 Bidders for this procurement must meet the following performance requirements:

Please refer to the attachment for details (if necessary).

3.5 Bidders for this procurement must meet the following capability, financial, and other requirements:

Financial requirements: Please refer to the attachment for details (if necessary).

Capability requirements: Please refer to the attachment for details (if necessary).

Other requirements: 1. The following enterprise qualification documents that have passed the annual inspection are required:

(1) Scanned copy or photo of the original business license (or duplicate);

(2) Scanned copy or photo of the original tax registration certificate (or duplicate) (except for those with a unified three-in-one certificate);

(3) Scanned copy or photo of the original organization code certificate (or duplicate) (except for those with a unified three-in-one certificate).

3.6 For projects that must be tendered according to the law, bids from dishonest persons subject to enforcement are invalid.

4. Obtaining Procurement Documents

4.1 Interested bidders are requested to log in to the Ansteel Smart Tendering and Bidding Platform at http://bid.ansteel.cn to download the electronic procurement documents from 15:00 on May 26, 2025, to 08:00 on June 5, 2025 (Beijing time, the same hereinafter).

Click to view tender details: 》Ansteel Guangzhou Automotive Steel CGL2 Project Power Distribution System - Copper Busbar Procurement Announcement

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
"Premier Li Qiang Leads State Council Meeting on Enhancing Effective Investment, Boosting Economic Growth"
19 hours ago
"Premier Li Qiang Leads State Council Meeting on Enhancing Effective Investment, Boosting Economic Growth"
Read More
"Premier Li Qiang Leads State Council Meeting on Enhancing Effective Investment, Boosting Economic Growth"
"Premier Li Qiang Leads State Council Meeting on Enhancing Effective Investment, Boosting Economic Growth"
Premier Li Qiang presided over an executive meeting of the State Council to study policy measures for promoting effective investment. The meeting noted that promoting effective investment plays an important role in stabilizing economic growth and strengthening momentum for development. It is necessary to innovate and improve policy measures, and intensify efforts to enhance the efficiency of utilizing funds such as central budget investments, ultra-long-term special treasury bonds, local government special bonds, and new-type policy-based financial instruments. In conjunction with formulating and implementing the 15th Five-Year Plan
19 hours ago
"Guided by Xi Jinping Thought, Implement 20th CPC Congress Spirit, Apply New Development Philosophy...
19 hours ago
"Guided by Xi Jinping Thought, Implement 20th CPC Congress Spirit, Apply New Development Philosophy...
Read More
"Guided by Xi Jinping Thought, Implement 20th CPC Congress Spirit, Apply New Development Philosophy...
"Guided by Xi Jinping Thought, Implement 20th CPC Congress Spirit, Apply New Development Philosophy...
Guided by Xi Jinping Thought on Socialism with Chinese Characteristics for a New Era, we will thoroughly implement the spirit of the 20th National Congress of the Communist Party of China and the plenary sessions of the Party’s 20th Central Committee, fully and faithfully apply the new development philosophy, strengthen top-level design, build computing power interconnection nodes oriented toward national hub periods, major strategic regions, and key industries, establish a system of computing power interconnection nodes, improve the efficiency and service level of public computing power resources, and promote high-quality development of computing power.
19 hours ago
Indirect Iran-US Nuclear Talks in Muscat Show Progress, Omani FM Mediates Tense but Efficient Discussions
19 hours ago
Indirect Iran-US Nuclear Talks in Muscat Show Progress, Omani FM Mediates Tense but Efficient Discussions
Read More
Indirect Iran-US Nuclear Talks in Muscat Show Progress, Omani FM Mediates Tense but Efficient Discussions
Indirect Iran-US Nuclear Talks in Muscat Show Progress, Omani FM Mediates Tense but Efficient Discussions
After intensive indirect consultations, the new round of nuclear talks between Iran and the US in Muscat, the capital of Oman, has achieved phased progress. It is reported that during this round of talks, the Iranian and US delegations did not meet directly. Instead, Omani Foreign Minister Badr acted as an intermediary, conveying a series of core proposals, strategic concerns, and policy positions to the other side. The atmosphere at the talks was tense yet efficient. According to preliminary on-site assessments, although both sides continue to negotiate over specific terms, they have reached a consensus on the key objective of "continuing dialogue."
19 hours ago