Tender for Procurement of Copper Cooling Stave and Other Projects (BG2025050130)

Published: May 26, 2025 11:22

1. Procurement Conditions

The purchaser for this procurement project, which includes items such as copper cooling staves (BG2025050130) (BGBCGFHGXHD250523212420), is the Production Spare Parts Procurement Department of the Procurement Center of Benxi Iron & Steel (Group) Sheet Co., Ltd. The funding for this procurement project is self-raised, and the project now meets the procurement conditions. A public inquiry and comparison is now being conducted.

2. Project Overview and Procurement Scope

2.1 Project Name: Items such as copper cooling staves (BG2025050130)

2.2 Alternative procurement methods in case of procurement failure: Transition to direct procurement or negotiation procurement

2.3 For details on the procurement content, scope, and scale of this project, please refer to the attached "Material List Attachment.pdf".

3. Bidder Qualification Requirements

3.1 Consortium bidding is not allowed for this procurement.

3.2 For this procurement, the bidder must meet the following qualification requirements:

(1) A production-oriented business license

3.3 For this procurement, the bidder must meet the following registered capital requirements:

Registered capital for production-oriented enterprises: 500 (10,000 yuan) or above

3.4 For this procurement, the bidder must meet the following performance requirements:

The bidder is required to provide at least one contract and corresponding invoice for newly manufactured copper cooling staves for blast furnaces with a capacity of 2580 m³ or above from a steel enterprise with a crude steel production capacity of 10 million mt or above in the past three years (data sourced from the SteelHome website, with the query URL being https://news.steelhome.cn). If the contract or invoice does not clearly indicate a blast furnace capacity of 2580 m³ or above, written and stamped certification materials from the end-user are required.

The performance amount for copper cooling staves should reach 30% or above of the supplier's tax-exclusive bid amount, based on the tax-exclusive amount on the invoice (the period is within three years prior to the release of the tender announcement, and both the contract and corresponding invoice must fall within this period).

(1) The supply performance must be the direct performance of the bidder or the approved party.

(2) Performance materials such as supply performance contracts and VAT invoices should be provided in accordance with the original content to facilitate verification of authenticity.

3.5 For this procurement, the bidder must meet the following capability, financial, and other requirements:

Financial requirements: Please refer to the attachment (if necessary)

Capability requirements: Please refer to the attachment (if necessary)

Other requirements: The bidder should provide the following qualification documents (color scanned copies or photocopies with the official seal of the unit are acceptable):

(1) Provide the bidder's (company's) business license.

(2) A scanned copy or photo of the original tax registration certificate (or duplicate), except for those with a unified social credit code certificate.

(3) Scanned copy or photo of the original Organization Code Certificate (or duplicate), except for those with the "three certificates integrated" (the Business License, Organization Code Certificate, and Tax Registration Certificate integrated into one).

(4) ID card of the authorized agent.

(5) Power of Attorney from the legal representative.

(6) Supply performance.

3.6 For projects that must undergo tendering in accordance with the law in this procurement, the bids submitted by dishonest persons subject to enforcement shall be invalid.

4. Acquisition of Procurement Documents

4.1 All interested bidders are requested to log in to the Ansteel Smart Tendering and Bidding Platform at http://bid.ansteel.cn to download the electronic procurement documents from 13:15 on May 24, 2025, to 13:15 on June 3, 2025 (Beijing time, the same hereinafter).

Click to view tender details: 》Procurement Announcement for Copper Cooling Stave and Other Projects (BG2025050130)

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
"Premier Li Qiang Leads State Council Meeting on Enhancing Effective Investment, Boosting Economic Growth"
17 hours ago
"Premier Li Qiang Leads State Council Meeting on Enhancing Effective Investment, Boosting Economic Growth"
Read More
"Premier Li Qiang Leads State Council Meeting on Enhancing Effective Investment, Boosting Economic Growth"
"Premier Li Qiang Leads State Council Meeting on Enhancing Effective Investment, Boosting Economic Growth"
Premier Li Qiang presided over an executive meeting of the State Council to study policy measures for promoting effective investment. The meeting noted that promoting effective investment plays an important role in stabilizing economic growth and strengthening momentum for development. It is necessary to innovate and improve policy measures, and intensify efforts to enhance the efficiency of utilizing funds such as central budget investments, ultra-long-term special treasury bonds, local government special bonds, and new-type policy-based financial instruments. In conjunction with formulating and implementing the 15th Five-Year Plan
17 hours ago
"Guided by Xi Jinping Thought, Implement 20th CPC Congress Spirit, Apply New Development Philosophy...
17 hours ago
"Guided by Xi Jinping Thought, Implement 20th CPC Congress Spirit, Apply New Development Philosophy...
Read More
"Guided by Xi Jinping Thought, Implement 20th CPC Congress Spirit, Apply New Development Philosophy...
"Guided by Xi Jinping Thought, Implement 20th CPC Congress Spirit, Apply New Development Philosophy...
Guided by Xi Jinping Thought on Socialism with Chinese Characteristics for a New Era, we will thoroughly implement the spirit of the 20th National Congress of the Communist Party of China and the plenary sessions of the Party’s 20th Central Committee, fully and faithfully apply the new development philosophy, strengthen top-level design, build computing power interconnection nodes oriented toward national hub periods, major strategic regions, and key industries, establish a system of computing power interconnection nodes, improve the efficiency and service level of public computing power resources, and promote high-quality development of computing power.
17 hours ago
Indirect Iran-US Nuclear Talks in Muscat Show Progress, Omani FM Mediates Tense but Efficient Discussions
17 hours ago
Indirect Iran-US Nuclear Talks in Muscat Show Progress, Omani FM Mediates Tense but Efficient Discussions
Read More
Indirect Iran-US Nuclear Talks in Muscat Show Progress, Omani FM Mediates Tense but Efficient Discussions
Indirect Iran-US Nuclear Talks in Muscat Show Progress, Omani FM Mediates Tense but Efficient Discussions
After intensive indirect consultations, the new round of nuclear talks between Iran and the US in Muscat, the capital of Oman, has achieved phased progress. It is reported that during this round of talks, the Iranian and US delegations did not meet directly. Instead, Omani Foreign Minister Badr acted as an intermediary, conveying a series of core proposals, strategic concerns, and policy positions to the other side. The atmosphere at the talks was tense yet efficient. According to preliminary on-site assessments, although both sides continue to negotiate over specific terms, they have reached a consensus on the key objective of "continuing dialogue."
17 hours ago