Xiaomi YU7 Pre-Released: Features Snapdragon 8 Cockpit Chip and Advanced Intelligence Tech

Published: May 23, 2025 19:21
【Xiaomi YU7 Pre-Released: Equipped with Snapdragon 8 Cockpit Chip】On May 22, Xiaomi's first SUV model YU7 was officially pre-released and is expected to be officially launched in July. The model is positioned as a mid-large SUV, with a length, width, and height of 4999/1996/1608mm and a wheelbase of 3000mm. It offers 9 body color options, including the main "emerald green" color, inspired by Colombian emeralds, as well as "titanium metal" and "lava orange" among the 9 body colors. In terms of intelligence, Xiaomi YU7 is equipped with a four-in-one domain control module, which includes the ADD auxiliary driving domain controller, T-Box communication module, DCD cockpit domain controller, and VCCD vehicle domain controller. The vehicle is equipped with the 4nm process Qualcomm third-generation Snapdragon 8 mobile platform cockpit SoC chip, with a boot time of only 1.35 seconds and a full-vehicle package upgrade in as fast as 15 minutes. In addition, the vehicle provides the NVIDIA DRIVE AGX Thor 700 TOPS Blackwell automotive computing platform, capable of realizing "4D millimeter-wave radar," and is equipped with 7 ultra-transparent anti-glare cameras, applying ALD coating technology.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
9 hours ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
9 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
9 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
9 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
9 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
9 hours ago