Tianjin to Increase Car License Plate Quotas by 80,000 via Lottery System

Published: May 23, 2025 19:07
[Tianjin to Add 80,000 License Plate Lottery Quotas] The General Office of the Tianjin Municipal People's Government recently issued the "Several Measures for Further Optimizing the Regulation and Management of Passenger Cars in Tianjin," which will come into effect on June 1. The "Several Measures" clarify that, in addition to the annual 100,000 incremental quotas stipulated in the "Regulations on the Regulation and Management of the Total Number of Passenger Cars in Tianjin," an additional 30,000 personal ordinary vehicle incremental quotas will be allocated annually through a lottery system, to be organized and implemented monthly by the municipal regulatory service agency. Meanwhile, an additional 50,000 personal ordinary vehicle quotas will be allocated annually for a separate tiered lottery. Citizens who have participated in the ordinary vehicle lottery 25 times or more without winning can participate. The lotteries will be held by the end of June and December each year (in 2025, they will be held by the end of July and December), with 25,000 personal ordinary vehicle incremental quotas released each time.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
8 hours ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
8 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
8 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
8 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
8 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
8 hours ago
[Tianjin to Add 80,000 License Plate Lottery Quotas] The General Offic - Shanghai Metals Market (SMM)