[Zeekr Power and Shell Recharge Reach Cooperation Agreement, First Batch of 666 Stations Connected] Zeekr Power has reached a cooperation agreement with Shell Recharge. It is reported that Zeekr Power has connected its first batch of 666 Shell Recharge stations, totaling over 12,000 high-quality charging terminals. The scale of Zeekr Power's connected high-quality charging terminals from third parties has exceeded 1.29 million, achieving 100% coverage of prefecture-level cities in mainland China. Among them, 5,025 stations have been connected in expressway service areas, and 7,448 ultra-fast charging stations have been connected, with a single-gun peak power of 360kW for ultra-fast charging stations. Currently, the 666 connected Shell Recharge stations cover Shanghai, Nanjing, Suzhou, Wuhan, Wuxi, Changsha, and Hefei, with stations in other cities to be opened successively in the future. In addition, Zeekr also has cooperation with other brands such as GAC Hyptec and NIO Power.