Dadukou District, Chongqing to Build 100 Integrated PV ESS Charging and Battery Swapping Stations with 2.5 Billion Yuan Investment

Published: May 12, 2025 18:19
[Signing in Dadukou District, Chongqing: Total Investment of 2.5 Billion Yuan to Build 100 Integrated PV ESS Charging and Battery Swapping Energy Stations!] Recently, Dadukou District, Chongqing, and Suwen Electric Power signed an investment cooperation agreement at the Shanghai International Auto Show. Suwen Electric Power plans to invest 2.5 billion yuan to establish an R&D and operation center for integrated energy stations in the Chengdu-Chongqing region at Dadukou, and intends to construct a total of 100 integrated energy stations in the Chengdu-Chongqing region to promote the improvement of local new energy infrastructure. It is reported that each integrated energy station will offer one-stop services integrating all or some of the following functions: PV power generation, ESS, charging, battery swapping, vehicle detection, and drone cargo transportation. The overall construction plan will be gradually implemented over a five-year period. Upon completion, it will form a comprehensive service network covering the bustling areas of the main urban districts, key suburban periods, and transportation hubs in the Chengdu-Chongqing region.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
2 hours ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
2 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
2 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
2 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
2 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
2 hours ago
[Signing in Dadukou District, Chongqing: Total Investment of 2.5 Billi - Shanghai Metals Market (SMM)