[Pan American Reports Q1 2025 Production Results]
On May 7, Pan American Silver released its Q1 2025 report, disclosing consolidated output from its zinc-lead operations. During the quarter, the company’s four zinc-lead mines produced approximately 14,000 tonnes of zinc in concentrate and 6,700 tonnes of lead in concentrate, representing year-on-year increases of 42.9% and 45.7%, respectively.
Performance by mine:
La Colorada (Mexico): 3,400 tonnes zinc in concentrate, 1,900 tonnes lead in concentrate
San Vicente (Bolivia): 2,600 tonnes zinc in concentrate, 300 tonnes lead in concentrate
Huaron (Peru): 6,300 tonnes zinc in concentrate, 4,100 tonnes lead in concentrate
Minera Florida (Chile): 1,700 tonnes zinc in concentrate, 400 tonnes lead in concentrate