【Pan American Releases Q1 2025 Report】On May 7, Pan American released its Q1 2025 report and disclosed the production of its mines for the quarter. During this quarter, its four lead-zinc mines collectively produced approximately 14,000 mt (metal content) of zinc concentrates and 6,700 mt (metal content) of lead concentrates. Breaking down by mine, the La Colorada mine in Mexico produced 3,400 mt (metal content) of zinc concentrates and 1,900 mt (metal content) of lead concentrates; the San Vicente mine in Bolivia produced 2,600 mt (metal content) of zinc concentrates and 300 mt (metal content) of lead concentrates; the Huaron mine in Peru produced 6,300 mt (metal content) of zinc concentrates and 4,100 mt (metal content) of lead concentrates; and the Minera Florida mine in Chile produced 1,700 mt (metal content) of zinc concentrates and 400 mt (metal content) of lead concentrates.