The Rapid Bidding Function is Officially Launched: Xiangyu New Energy Releases Its First Bidding Procurement Event

Published: May 5, 2025 11:40

Quick Bidding Function Launched

To enhance the efficiency of spot trading and better discover prices, the SMM Metal Trading Center launched a quick bidding trading model in April 2025. This model, while retaining the original bidding functions, further simplifies the participation process: traders initiating or participating in bids only need to complete the enterprise certification on the "Anhuida" trading platform to participate.

The first quick bidding event will be initiated by Xiamen Xiangyu New Energy Co., Ltd., confirmed as a procurement bid, to be held on May 9, 2025, with the product being 1,200 mt of battery-grade lithium carbonate, divided into two sections, the procurement standards and detailed requirements are listed below. Xiamen Xiangyu New Energy and the SMM Metal Trading Center sincerely invite interested seller enterprises to actively participate.

Xiamen Xiangyu New Energy, under Xiangyu Co., Ltd. (600057.SH), is a new energy supply chain service provider focusing on the lithium battery, PV, and ESS sectors. By initiating this procurement bidding activity on the Anhuida platform of the SMM Metal Trading Center, it aims to diversify its procurement channels, efficiently expand its supplier base, reduce transaction costs, and more effectively discover reasonable market prices. After the successful completion of the first event, Xiamen Xiangyu New Energy plans to regularly conduct procurement bidding activities on the Anhuida platform.

Detailed Information on the Procurement Bidding Event

  • Procuring Company: Xiamen Xiangyu New Energy Co., Ltd.
  • Event Time: May 9, 2025

Section One: 10:00-10:30

Section Two: 11:00-11:30

  • Procurement Requirements: Battery-Grade Lithium Carbonate
  • Section One: 600 mt
  • Section Two: 600 mt
  • Minimum Bid Quantity: 150 mt as the minimum bid quantity, requiring each winning bidder to deliver no more than three brands, with each brand's quantity not less than 30 mt
  • Brand: No brand restrictions, but must meet the quality standards for the delivery of lithium carbonate futures contracts as specified in the GFEX Lithium Carbonate Futures and Options Business Rules
  • Production Date: Produced in January 2025 or later
  • Delivery Time: May-June 2025
  • Goods Inspection: After the goods are delivered to the designated warehouse, they will be inspected by a third-party inspection agency designated by the buyer (selected from the list of designated inspection agencies for GFEX lithium carbonate futures). If the quality is qualified, the inspection fee will be borne by the buyer; if unqualified, the seller will bear the inspection fee and negotiate with the buyer for return, exchange, or refund
  • Settlement Method: If the winning seller is a lithium carbonate producer, payment will be made upon delivery to the designated warehouse; if the winning seller is a lithium carbonate trader, payment will be made after delivery and passing the inspection (all deliveries must be accompanied by a quality inspection report that meets the GFEX battery-grade lithium carbonate standard, with other terms subject to the contract)
  • Bidding Rules:
  • Bidding Method: Bids will be placed based on the spot premiums/discounts over the GFEX LC2507 contract (decreasing from the starting premium/discount), with bidders required to note the available sales volume when placing their bids
  • Starting Premium/Discount: To be announced after the Labour Day holiday
  • Price Reduction Increment: 20 yuan/mt
  • Pricing Method: Seller pricing
  • Intention Deposit: 0
  • Delivery Guarantee Deposit: As per the contract agreement
  • Winning Bid Result: The lowest bidder wins (if the top bidder cannot meet the current section's procurement volume, the second-lowest bidder will win, with up to three sellers winning in each section)
  • Extension Mechanism: If there is a bid within the last minute before the end of the event, the event will automatically extend for 3 minutes; if there is a bid within these 3 minutes, the event will continue to extend for another 3 minutes, until no bids are placed within 3 minutes
  • Event Platform:

Anhuida Bidding Trading Platform: https://www.anhuida.com/jingjia

Event Details Page: https://www.anhuida.com/jingjia/detail/B0202504301011240-001

The SMM Metal Trading Center sincerely invites all suppliers to actively participate. If you are interested in participating, please log in to the Anhuida trading platform, visit the event details page, or contact the Anhuida business representative for registration.

Anhuida Business Representative: Yi Chen

Contact Number: 15901768289

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
12 hours ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
12 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
12 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
12 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
12 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
12 hours ago
The Rapid Bidding Function is Officially Launched: Xiangyu New Energy Releases Its First Bidding Procurement Event - Shanghai Metals Market (SMM)