Polaris Energy Storage Network has learned that on April 27, the tender announcement for the first batch of energy storage equipment for the Green Demonstration Application Project of the Virtual Power Plant in Ziyang City was released. The bid inviter for the project is Ziyang Ruiyan Environmental Protection and Energy Technology Co., Ltd., a subsidiary of Ziyang Industrial Investment Group. The project is located in Ziyang City, Sichuan Province. In line with the work deployment requirements of the municipal party committee and government, the project aims to establish a virtual power plant platform (a comprehensive operation and management platform) and construct energy and power infrastructure, including PV ESS charging facilities, across the city. This includes 5.99 MW of distributed PV, 80 MW/160 MWh of user-side ESS, and 402 charging guns. Through the use of internet and IoT technologies, various types of resources, including distributed PV, user-side ESS, and charging and battery swapping facilities, will be connected to the platform and managed in a unified and aggregated manner, enabling resources to be "observable, measurable, and controllable." This will allow the resources to participate in power system operation and electricity market transactions as a special power plant, ensuring the reliability of the large power grid, promoting the high-proportion consumption of renewable energy, enhancing the flexibility of electricity consumption, and reducing energy costs for users. The total estimated investment for the project is 370 million yuan.
A manufacturer may only entrust one agent to participate in the bidding for equipment of the same brand and model. For bundled procurement of multiple types of equipment, the bid inviter shall select the main equipment and require the bidder to provide authorization. The main equipment includes: battery cabins, converter-booster integrated machines, liquid-cooled outdoor integrated cabinets, confluence cabinets, and energy management systems.
Equipment Procurement/Section for the First Batch of Energy Storage Equipment for the Green Demonstration Application Project of the Virtual Power Plant in Ziyang City (Project Name)
Tender Announcement
1. Tendering Conditions
1.1 This tendering project, namely the First Batch of Energy Storage Equipment for the Green Demonstration Application Project of the Virtual Power Plant in Ziyang City (Project Name), has been approved for construction by the Ziyang Development and Reform Commission (the name of the project approval, authorization, or filing authority) with the approval document number and title being Chuantouzibei [2409-512000-04-04-768115] FGQB-0032. The project owner is Ziyang Ruiyan Environmental Protection and Energy Technology Co., Ltd. The construction funds are self-raised (source of funds), with the project's capital contribution ratio being 100%. The bid inviter is Ziyang Ruiyan Environmental Protection and Energy Technology Co., Ltd. The project now meets the tendering conditions, and a public tender is being conducted for the procurement of the first batch of energy storage equipment (equipment name) for this project.
1.2 This tendering project has been authorized by the Ziyang Development and Reform Commission (the name of the approval authority) with the tendering matter authorization document number being Chuantouzibei [2409-512000-04-04-768115] FGQB-0032. The tendering organization form is entrusted tendering. The tendering agency selected by the bid inviter is Sichuan Jinting Engineering Project Management and Consulting Co., Ltd.
2. Project Overview and Tendering Scope
2.1 Construction Location: Yanjiang District, High-tech Zone, Lingkong Economic Zone, Anyue County, Lezhi County, Zhonghe Town, etc., in Ziyang City.
2.2 Project Overview: The Green Demonstration Application Project of the Virtual Power Plant in Ziyang City aims to establish a virtual power plant platform (a comprehensive operation and management platform) and construct energy and power infrastructure, including PV ESS charging facilities, across the city, in line with the work deployment requirements of the municipal party committee and government. This includes 5.99 MW of distributed PV, 80 MW/160 MWh of user-side ESS, and 402 charging guns. Through the use of internet and IoT technologies, various types of resources, including distributed PV, user-side ESS, and charging and battery swapping facilities, will be connected to the platform and managed in a unified and aggregated manner, enabling resources to be "observable, measurable, and controllable." This will allow the resources to participate in power system operation and electricity market transactions as a special power plant, ensuring the reliability of the large power grid, promoting the high-proportion consumption of renewable energy, enhancing the flexibility of electricity consumption, and reducing energy costs for users. The total estimated investment for the project is 370 million yuan.
2.3 Section Division: One section for equipment procurement.
2.4 Delivery Date: Equipment supply shall be completed in batches within 36 months from the effective date of the contract.
2.5 Delivery Location: Yanjiang District, High-tech Zone, Lingkong Economic Zone, Anyue County, Lezhi County, Zhonghe Town, etc., in Ziyang City (to meet the actual needs of the project site).
2.6 Quality Standards: Compliance with relevant national and industry standards, as well as the parameter requirements specified in the technical specifications.
(Explanation of the construction location, scale, construction period, section division of the engineering construction project, as well as the name, quantity, technical specifications, delivery location, and delivery date of the equipment to be procured in this tender)
(Explanation of the construction location, scale, construction period, section division of the engineering construction project, as well as the name, quantity, technical specifications, delivery location, and delivery date of the equipment to be procured in this tender)
3. Bidder Qualification Requirements
3.1 This tender requires bidders to meet the following qualifications:
3.1.1 Qualification Requirements: Bidders must possess independent corporate legal person status and a valid business license (if there are qualification requirements for manufacturers, they should be listed separately and noted), and have the corresponding supply capacity for this tendering project.
3.1.2 Bidder Performance Requirements:
☑ No bidder performance requirements.
3.1.3 Performance Requirements for Bidding Equipment:
☑ No performance requirements for bidding equipment.
3.2 Joint bidding is not accepted for this tender.
3.3 A manufacturer may only entrust one agent to participate in the bidding for equipment of the same brand and model. For bundled procurement of multiple types of equipment, the bid inviter shall select the main equipment and require the bidder to provide authorization. The main equipment includes: battery cabins, converter-booster integrated machines, liquid-cooled outdoor integrated cabinets, confluence cabinets, and energy management systems.
For queries, please contact Lemon Zhao at lemonzhao@smm.cn