BYD was shortlisted for the tender of the 50MW/100MWh energy storage system equipment procurement for the standalone ESS power station project of China Resources in Nansha, Guangdong.

Published: Apr 27, 2025 13:18

Polaris Energy Storage Network learned that on April 25, the list of winning candidates for the procurement of the 50MW/100MWh energy storage system equipment for the China Resources Power Nansha Standalone ESS Power Station Project was announced.

The first winning candidate is BYD Auto Industry Co., Ltd., with a bid price of 52.58 million yuan, equivalent to a unit price of 0.526 yuan/Wh.

The second winning candidate is Beijing HyperStrong Technology Co., Ltd., with a bid price of 52.3409 million yuan, equivalent to a unit price of 0.523 yuan/Wh.

The bid inviter is Guangzhou China Resources Thermal Power Co., Ltd. The project is located within the premises of Guangzhou China Resources Thermal Power Co., Ltd. in Huangge Town, Nansha District, Guangzhou City, Guangdong Province. This tender is for the procurement of 50MW/100MWh energy storage system equipment.

China Resources Power Nansha Standalone ESS Power Station Project

50MW/100MWh Energy Storage System Equipment Procurement

Announcement of Winning Candidates

Announcement No.: SZBHX202504250047

The procurement of 50MW/100MWh energy storage system equipment for the China Resources Power Nansha Standalone ESS Power Station Project (Section No.: S12000825SZ0001P1) has completed the evaluation process through public tender, and the results are announced as follows:

I. Project Overview

Project Name: China Resources Power Nansha Standalone ESS Power Station Project

Section Name: 50MW/100MWh Energy Storage System Equipment Procurement

Section No.: S12000825SZ0001P1

Bid Inviter: Guangzhou China Resources Thermal Power Co., Ltd.

Tender Agency: China Resources Shouzheng Tendering Co., Ltd.

II. Evaluation Results

1. First Winning Candidate: BYD Auto Industry Co., Ltd.

1.1 Bid Price: 52,580,000.00 yuan

1.2 Quality: Meets the requirements of the tender documents

1.3 Construction Period/Delivery Date/Service Period: Meets the requirements of the tender documents

1.4 Project Leader Information: Name: -- Certificate Name: -- Certificate No.: --

1.5 Qualifications: Meets the requirements of the tender documents

1.6 Performance:

2. Second Winning Candidate: Beijing HyperStrong Technology Co., Ltd.

2.1 Bid Price: 52,340,900.00 yuan

2.2 Quality: Meets the requirements of the tender documents

2.3 Construction Period/Delivery Date/Service Period: Meets the requirements of the tender documents

2.4 Project Leader Information: Name: -- Certificate Name: -- Certificate No.: --

2.5 Qualifications: Meets the requirements of the tender documents

2.6 Performance:

3. Third Winning Candidate: /

3.1 Bid Price: /

3.2 Quality: /

3.3 Construction Period/Delivery Date/Service Period: /

3.4 Project Leader Information: /

3.5 Qualifications: /

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
China Approves 17.44 GW Power Plan for Qaidam Desert Base, Including Solar, Wind, and Energy Storage Projects
19 hours ago
China Approves 17.44 GW Power Plan for Qaidam Desert Base, Including Solar, Wind, and Energy Storage Projects
Read More
China Approves 17.44 GW Power Plan for Qaidam Desert Base, Including Solar, Wind, and Energy Storage Projects
China Approves 17.44 GW Power Plan for Qaidam Desert Base, Including Solar, Wind, and Energy Storage Projects
It is understood that the National Energy Administration has officially approved the power source allocation plan for the "Qaidam Desert Base (East Golmud) Base". The planned construction scale of the power source projects at this base is 17.44 million kilowatts, including 10 million kilowatts of photovoltaic power, 5 million kilowatts of wind power, 2.64 million kilowatts of coal-fired power, 0.1 million kilowatts of solar thermal power, and 1.5 million kilowatts (for 4 hours) of electrochemical energy storage. The total investment in the projects is about 86 billion yuan. The new energy will be transmitted to Guangxi through the "Qinghai-Guangxi DC" UHV power transmission project. Currently, significant progress has been made in the preliminary work of the "Qinghai-Guangxi DC" project, w
19 hours ago
[SMM PV News] Armenia Hits 1.1 GW Solar Capacity,
Feb 6, 2026 09:17
[SMM PV News] Armenia Hits 1.1 GW Solar Capacity,
Read More
[SMM PV News] Armenia Hits 1.1 GW Solar Capacity,
[SMM PV News] Armenia Hits 1.1 GW Solar Capacity,
Armenia’s cumulative solar capacity has surged to 1.1 GW following the addition of approximately 615 MW in 2025. This rapid expansion has pushed solar's share of electricity generation to around 15%, effectively meeting the country's 2030 target years ahead of schedule. The growth is heavily driven by a net-metering scheme supporting over 50,000 autonomous producers (totaling 650 MW), though the government ended loan subsidies for rooftop solar in July to shift focus toward battery storage.
Feb 6, 2026 09:17
Spot Market and Domestic Inventory Brief Review (February 5, 2026) [SMM Silver Market Weekly Review]
Feb 5, 2026 17:36
Spot Market and Domestic Inventory Brief Review (February 5, 2026) [SMM Silver Market Weekly Review]
Read More
Spot Market and Domestic Inventory Brief Review (February 5, 2026) [SMM Silver Market Weekly Review]
Spot Market and Domestic Inventory Brief Review (February 5, 2026) [SMM Silver Market Weekly Review]
Feb 5, 2026 17:36