Demand and Cost Squeeze from Both Sides, Battery Prices Decline [SMM Silicon-Based PV Morning Meeting Summary]

게시됨: Apr 25, 2025 12:09
SMM Silicon-Based PV Morning Meeting Summary: Demand and Cost Squeeze, Cell Prices Decline. The price of high-efficiency PERC182 solar cells (23.2% and above efficiency) is 0.3-0.3 yuan/W, with prices declining and fewer orders. The price of Topcon183 solar cells (25% and above efficiency) is around 0.28-0.29 yuan/W; Topcon210RN solar cells are priced at 0.275-0.29 yuan/W; Topcon210 solar cells are priced at around 0.29-0.3 yuan/W.

》View SMM Silicon Product Quotes

》Order and View SMM Metal Spot Historical Price Trends

》Click to View SMM Metal Industry Chain Database

SMM April 25 News:

Silica

Price

The silica market prices remained stable this week, but actual transactions retained some room for negotiation. Currently, the mine-mouth price of high-grade silica in Hubei is 350-420 yuan/mt. The mine-mouth price of high-grade silica in Inner Mongolia is 320-370 yuan/mt. The mine-mouth price of high-grade silica in Guangxi is 360-380 yuan/mt. The mine-mouth price of high-grade silica in Guizhou is 290-330 yuan/mt.

Production

Remains in a loose state.

Demand

Affected by the continued downturn in the silicon metal market, most silicon enterprises hold a pessimistic attitude towards future market changes, and the operating rate has dropped to a low level. Therefore, procurement is mainly based on rigid demand. In the short term, silica demand will remain weak.

Silicon Metal

Price

Yesterday, SMM oxygen-blown #553 silicon in east China was 9,500-9,800 yuan/mt, and #441 silicon was 9,800-10,000 yuan/mt. The most-traded SI2505 futures contract fluctuated around 8,800-8,900 yuan/mt. Downstream orders were released as needed, and the center of spot transaction prices moved down MoM.

Production:

The main continuous contract of silicon metal futures operated below 9,000 yuan/mt. Silicon enterprises faced significant production pressure, compounded by weak demand and the impact of low-priced spot and futures sources. The operating rate of silicon enterprises is expected to be weak.

Inventory

Social Inventory: SMM statistics show that the total social inventory of silicon metal in major regions on April 18 was 612,000 mt, flat WoW. Among them, social ordinary warehouses were 137,000 mt, down 1,000 mt WoW, and social delivery warehouses were 475,000 mt (including unregistered warrants and spot parts), up 1,000 mt WoW. (Excluding Inner Mongolia, Gansu, etc.)

Wafer

Price

The market price of N-type 18X wafers is 1.1-1.2 yuan/piece, and N-type 210RN wafers are 1.3-1.35 yuan/piece. Prices dropped back slightly this week, with high-priced resources facing sales difficulties. Market sentiment is weak, and solar cell plants have limited procurement enthusiasm due to subsequent production cut plans.

Production

Domestic wafer production in April is expected to be 58GW+, and domestic wafer production in May is expected to be slightly adjusted downward due to quarterly quota adjustments, with leading manufacturers reducing their operating rates.

Inventory

Solar cells have recently started to cut production, and market bearish sentiment is strong. Downstream procurement enthusiasm is weak, and overall order signing is limited. Wafer inventory has increased.

Solar Cell

Price

The price of high-efficiency PERC182 cells (23.2% and above efficiency) is 0.3-0.3 yuan/W, with prices declining and few orders. The PERC210 cell market has no trading volume.

Topcon183 cells (25% and above efficiency) are priced at 0.28-0.29 yuan/W; Topcon210RN cells are 0.275-0.29 yuan/W; Topcon210 cells are 0.29-0.3 yuan/W. Both market demand and cost support for cells are insufficient, and prices still have downside room.

HJT direct sales are few, and integrated manufacturers are self-sufficient.

Production

PV cell production in April reached 63-64GW, up more than 13% MoM. Topcon210R and 210N cell production increased by more than 36% MoM. Cell supply is sufficient, and inventory buildup began in mid-to-late April, with a tendency to cut production in May.

Inventory

Cell inventory continues to rise.

PV Film

Price

PV-grade EVA

The price of PV-grade EVA is 11,550-11,950 yuan/mt. The domestic delivery-to-factory price of PV-grade POE is about 12,000-14,000 yuan/mt, and POE prices remain stable.

PV Film

The current mainstream price of 420g transparent EVA film is 5.46-5.67 yuan/m², 420g white EVA film is 5.96-6.17 yuan/m², 380g EPE film is 5.79-5.89 yuan/m², and 380g POE film is 6.84-7.22 yuan/m².

Production

PV-grade EVA production increased by 8.22% MoM in April, and PV film production increased by 9.07% MoM.

Inventory

Petrochemical enterprises currently have low inventory, and the transaction pace of PV-grade EVA has slowed recently.

데이터 출처 설명: 공개 정보를 제외한 모든 데이터는 SMM이 공개 정보, 시장 커뮤니케이션 및 SMM 내부 데이터베이스 모델을 기반으로 가공한 것입니다. 본 자료는 참고용이며 의사결정 권고를 구성하지 않습니다.

문의 사항이 있거나 자세한 정보를 원하시면 아래로 연락해 주시기 바랍니다: lemonzhao@smm.cn
리서치 보고서 열람 방법에 대한 자세한 내용은 아래로 문의하시기 바랍니다:service.en@smm.cn
관련 뉴스
[태양광: 방글라데시, 5GW 목표로 순계량 옥상 태양광에 kWh당 0.086달러 요금제 도입]
37분 전
[태양광: 방글라데시, 5GW 목표로 순계량 옥상 태양광에 kWh당 0.086달러 요금제 도입]
더 보기
[태양광: 방글라데시, 5GW 목표로 순계량 옥상 태양광에 kWh당 0.086달러 요금제 도입]
[태양광: 방글라데시, 5GW 목표로 순계량 옥상 태양광에 kWh당 0.086달러 요금제 도입]
방글라데시 전력부는 자국 순계량 제도에 따라 적격 옥상 태양광 시스템의 잉여 전력에 대해 kWh당 10.50타카(0.086달러)의 요금을 발표했으며, 2030년 2월 28일까지 3년간 유효하다. 배터리 저장장치를 갖춘 옥상 태양광 시스템의 최대 발전 비용은 kWh당 8타카로 설정되었으며, 정부는 20%의 이윤과 11.25%의 프리미엄을 추가했다. 2027년 2월 28일까지 설치되어 2025년 순계량 지침에 따라 적격한 시스템은 인센티브 요금을 받을 수 있다. 정부는 여름철 성수기 수요 시 3GW를 초과하는 일일 전력 부족 문제를 해결하기 위해 내년 여름까지 순계량을 통해 최소 5GW의 태양광 용량을 설치하는 것을 목표로 하고 있다.
37분 전
[Solar: 호주 프론티어 에너지, 서호주 Waroona 하이브리드 태양광-배터리 프로젝트 계약 체결]
38분 전
[Solar: 호주 프론티어 에너지, 서호주 Waroona 하이브리드 태양광-배터리 프로젝트 계약 체결]
더 보기
[Solar: 호주 프론티어 에너지, 서호주 Waroona 하이브리드 태양광-배터리 프로젝트 계약 체결]
[Solar: 호주 프론티어 에너지, 서호주 Waroona 하이브리드 태양광-배터리 프로젝트 계약 체결]
프론티어 에너지는 서호주 남서부에 위치한 와루나 재생에너지 프로젝트 1단계의 모든 주요 계약을 체결했다고 발표했다. 이 프로젝트는 132MW 규모의 태양광 발전 시설과 81.5MW/565MWh 규모의 배터리 에너지 저장 시스템으로 구성된다. 론지가 650W 및 655W 정격의 태양광 패널 20만 장 이상을 공급하고, 트리나솔라가 20년 보증 및 장기 서비스 계약에 따라 배터리 유닛을 공급하며, SMA가 인버터를 제공한다. 프로젝트 예산은 약 3억 1천만 달러이며, 이번 달에 착공하여 2028년 첫 전력 생산을 목표로 한다. 향후 태양광 1GW 및 저장 용량 660MW 규모로 확장할 계획이다.
38분 전
[태양광: 말레이시아, 2.5GW 태양광 및 1.25GW 저장장치를 포함한 LSS6 국가 태양광 프로그램 출범]
38분 전
[태양광: 말레이시아, 2.5GW 태양광 및 1.25GW 저장장치를 포함한 LSS6 국가 태양광 프로그램 출범]
더 보기
[태양광: 말레이시아, 2.5GW 태양광 및 1.25GW 저장장치를 포함한 LSS6 국가 태양광 프로그램 출범]
[태양광: 말레이시아, 2.5GW 태양광 및 1.25GW 저장장치를 포함한 LSS6 국가 태양광 프로그램 출범]
말레이시아 에너지전환·수자원전환부는 7월에 LSS6 대규모 태양광 입찰을 시작하여 총 2,500MW의 태양광 용량과 1,250MW의 배터리 에너지 저장장치를 결합하고, 부미푸테라 기업을 위해 150MW를 별도 배정했다. 이는 말레이시아 사상 최대 규모의 유틸리티급 태양광 입찰이자, 태양광-ESS 하이브리드 개발을 의무화한 첫 LSS 라운드이다. 이 프로그램은 약 130억~150억 링깃(약 32억~37억 달러)의 민간 투자를 유치할 것으로 예상되며, 프로젝트는 단계적으로 준공되어 2029년 12월 31일까지 완전 상업 운전을 목표로 한다.
38분 전