Unlocking Green Energy: Responsible Mineral Strategies in the Energy Transition

Published: Apr 25, 2025 10:05
Source: SMM
At the CLNB 2025 (10th) New Energy Industry Chain Expo - Battery Raw Material Forum hosted by SMM Information & Technology Co., Ltd. (SMM), Mr. Daniel Abdo, Director of International Relations and Business Development at Sigma Lithium, shared insights on the topic "Unlocking Green Energy: Responsible Mineral Strategies in the Energy Transition."

At the CLNB 2025 (10th) New Energy Industry Chain Expo - Battery Raw Material Forum hosted by SMM Information & Technology Co., Ltd. (SMM), Mr. Daniel Abdo, Director of International Relations and Business Development at Sigma Lithium, shared insights on the topic "Unlocking Green Energy: Responsible Mineral Strategies in the Energy Transition."

The significant disconnect in the EV supply chain

The EV supply chain is complex and requires investments of hundreds of billions of yuan.

Investments in clean technology can also include processing, parts, R&D, and new technologies.

How much ore is needed for each battery material?

Why is lithium the most important battery metal?

Lithium is the only common element in all cathode chemistries.

Mature technology and an experienced team ensure operational and production readiness

The proven DMS circuit processes the entire production; tested for three years at the on-site demonstration plant.

Brazil is an ideal location for lithium operations: a low-cost country, extensive infrastructure, strong rule of law, and a stable economy.

One of the world's largest and most mature mining countries: iron ore, niobium, bauxite, copper, etc.

Brazil is close to Atlantic ports, with lower logistics costs; hydroelectric power is available, and there are ready-made roads leading directly to the ports.

Sigma Lithium addresses challenges

Achieving low-cost production, ethical sourcing, without sacrificing sustainability.

We have successfully solved the "advantage puzzle."

Follow us for more information

LinkedIn: https://www.linkedin.com/company/98924065/admin/dashboard/

Facebook: https://www.facebook.com/profile.php?id=61572704694550

X.: https://x.com/CLNB_official

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
20 hours ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
20 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
20 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
20 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
20 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
20 hours ago