






This week, the price of DC-side battery cabins remained stable. The average price of a 5MWh DC-side battery cabin was 0.43 yuan/Wh, while the average price of 3.44/3.72MWh DC-side battery cabins was 0.438 yuan/Wh. Domestic ESS projects were produced on demand, and the price fluctuation of DC-side battery cabins was relatively small.
On April 22, the winning bid result for the EPC general contracting of the Heshan Suoying Xinneng Common Mode 300MW/900MWh ESS Power Station Project was announced. The project is located in Heshan City, Laibin City, Guangxi Zhuang Autonomous Region, with an ESS capacity of 300MW/900MWh. It includes the construction of a booster station with a building area of 7,500㎡ and a main transformer low-voltage side voltage of 35kV. The bid winner quoted 13,050,081,303 yuan, with a converted unit price of 1.45 yuan/Wh.
SMM New Energy Industry Research Department
Cong Wang 021-51666838
Xiaodan Yu 021-20707870
Rui Ma 021-51595780
Ying Xu 021-51666707
Disheng Feng 021-51666714
Yujun Liu 021-20707895
Yanlin Lyu 021-20707875
Zhicheng Zhou 021-51666711
Haohan Zhang 021-51666752
Zihan Wang 021-51666914
Xiaoxuan Ren 021-20707866
Yushuo Liang 021-20707892
Jie Wang 021-51595902
Yang Xu 021-51666760
Bolin Chen 021-51666836
For queries, please contact Lemon Zhao at lemonzhao@smm.cn
For more information on how to access our research reports, please email service.en@smm.cn