CLNB 2025: Address Challenges in I&C ESS

Published: Apr 22, 2025 17:46
Source: SMM
At the CLNB 2025 (10th) New Energy Industry Chain Expo - New Energy PV ESS Forum hosted by SMM Information & Technology Co., Ltd. (SMM), Liangjun Ma, Director of the Jiangsu Region of the Industrial and Commercial Sales Department of Xi'an JD Energy Co., Ltd., shared insights on the topic of "Distributed ESS Solutions for Industrial and Commercial Owners and Investors." Exploration of Industrial and Commercial ESS Solutions and Applications

At the CLNB 2025 (10th) New Energy Industry Chain Expo - New Energy PV ESS Forum hosted by SMM Information & Technology Co., Ltd. (SMM), Liangjun Ma, Director of the Jiangsu Region of the Industrial and Commercial Sales Department of Xi'an JD Energy Co., Ltd., shared insights on the topic of "Distributed ESS Solutions for Industrial and Commercial Owners and Investors."

Exploration of Industrial and Commercial ESS Solutions and Applications

Market Analysis

Fundamental Measures for Low-Carbon Development

Three Key Aspects of Low-Carbon Development

First Aspect: End-User Electrification

Coal to electricity; oil to electricity; gas to electricity; electricity is the cleanest and easiest to convert.

Second Aspect: Low-Carbon Power Generation

Increase the proportion of power generation from clean energy sources such as wind, solar, and hydro, reduce the proportion of thermal power generation, and even replace thermal power generation.

Third Aspect: Power Intelligence

Smart grid, smart ESS, and smart energy storage.

Wind and solar power are low-cost, but their temporal and spatial mismatch necessitates energy storage.

The 14th Five-Year Plan: By 2025, 20% of vehicles will be new energy, which has already been exceeded, reaching 30%. One-fifth of power generation.

The business model for industrial and commercial ESS is already clear.

Demand Management

Reducing User Demand Charges

The two-part tariff consists of a fixed charge plus a variable charge based on the energy consumed. The fixed charge covers the cost of maintaining the supply infrastructure, while the variable charge is based on actual usage. The first one is the fixed charge and the second is the running charge. The fixed charge is because of the maximum demand and the second charge depends on the energy consumption by the load.

After installing an ESS in an industrial and commercial park that implements the two-part tariff, the real-time power of the user's transformer can be monitored. When the real-time power exceeds the maximum demand, the ESS automatically discharges to monitor the real-time power, reducing the transformer's output and ensuring that the transformer's power does not exceed the limit, thereby reducing user demand charges and lowering the electricity costs for the industrial and commercial park.

Virtual Power Plant - Integrating Resources, Unified Dispatch

The industrial and commercial ESS market has enormous potential.

Challenge Analysis

Issues Facing the Development of Industrial and Commercial ESS

Technical Issues:

Harmonics & resonance issues, demand management, transformer capacity limitations, PF control, power market interaction, protocol compatibility, storage-charging coordination, PV ESS coordination, etc. Environmental Adaptability Issues:

High pollution, access conditions, installation sites, high temperature, high humidity, etc.

How to Further Reduce the Life Cycle LCOS of Industrial and Commercial ESS

Summary

JD Energy was the first to propose a modular ESS all-in-one solution, which has now become the mainstream solution in the industry;

JD Energy was the first to hold an ecological partner conference for industrial and commercial ESS, which has also become the mainstream model for market promotion;

JD Energy was the first to collaborate with financial leasing institutions to create the industry's first operational leasing product for industrial and commercial ESS, accelerating the process of industry-scale development;

JD Energy was the first in the national industrial and commercial ESS sector to purchase commercial comprehensive liability insurance for investors and owners, offered for free;

JD Energy has a complete 3S R&D, production, and manufacturing system, with battery cells preferentially sourced from CATL, ensuring greater safety;

JD Energy has an efficient and professional delivery and operation team, ensuring high-efficiency use throughout the life cycle.

LinkedIn: https://www.linkedin.com/company/98924065/admin/dashboard/

Facebook: https://www.facebook.com/profile.php?id=61572704694550

X.: https://x.com/CLNB_official

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
5 hours ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
5 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
5 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
5 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
5 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
5 hours ago