CLNB 2025 Global Lithium Battery Tour (Second Stop in Sichuan) - Yibin Wanpeng Times Technology Co., Ltd.

Published: Apr 30, 2025 14:20
Source: SMM
After the conclusion of the CLNB 2025 (10th) New Energy Industry Chain Expo hosted by SMM, SMM has meticulously organized a field trip, composed of representatives from companies worldwide, including Atlantic Lithium, German Mineral Resources Agency (DERA), ING Wholesale Banking, and LG Energy Solution, etc. to visit multiple enterprises in the new energy industry chain.

After the conclusion of the CLNB 2025 (10th) New Energy Industry Chain Expo hosted by SMM, SMM has meticulously organized a field trip, composed of representatives from companies worldwide, including Atlantic Lithium, German Mineral Resources Agency (DERA), ING Wholesale Banking, and LG Energy Solution, etc. to visit multiple enterprises in the new energy industry chain.

On April 21, Adam Shen, Director of New Energy Division Lithium/Anode Industry, Annie Chen, Director of Overseas Marketing Lithium Battery Sector, Cherry Li, Overseas Information Department Account Manager from SMM, along with the delegation members, paid a visit to Yibin Wanpeng Times Technology Co., Ltd., Jian Zou, chairman of Wanpeng, along with the company's management team, head of technical, production, and sales teams, warmly welcomed the delegation and provided a detailed introduction to the company's business development. Jinbo Zhang, the company's general manager, also participated in the online meeting, engaging in in-depth discussions with the delegation on the new energy materials industry.

Sichuan Wanpeng Times was established in July 2021 as a high-tech enterprise specializing in the R&D, production, sales, and service of LFP cathode materials. In August 2021, the company established a wholly-owned subsidiary, Yibin Wanpeng, with a planned total capacity of 200,000 mt.
In May 2023, the first phase of the Yibin base officially commenced production, with the first 20,000 mt production line already operational, and the second phase's 30,000 mt production line actively under preparation.
Regarding future capacity planning, Yibin Wanpeng is expected to initiate the construction of the second phase (30,000 mt/year production line) of the phase I project in 2025. Subsequently, the 50,000 mt capacity of phase II project will begin construction in 2026.

The company's advantages:

Resource advantages:

Phosphate ore, phosphoric acid —Chanhen Group.

Iron phosphate —Chanhen Group in collaboration with Gotion High-tech and Sunwoda.

Lithium carbonate —Chanhen Group in collaboration with Jinyuan Group and Sunwoda.

The combination of phosphorus and lithium resources provides a solid foundation for Wanpeng's development.

Energy advantages:

Hydropower —Green energy strongly supports customers' low-carbon products, and the electricity prices at the Yibin base offer certain advantages compared to other LFP companies.

Natural gas —The natural gas prices at the Yibin base, after government subsidies, provide certain advantages compared to other LFP companies.

Location advantages:

Convenient transportation —The project is located in Yibin, integrating shipping, land transport, and railway transportation advantages, with well-connected transportation networks.

The area boasts a concentration of industrial technical workers, a favorable business environment, and strong support from excellent R&D talents in the Chengdu-Chongqing region.

Wanpeng's production site features new production lines, reasonable design configurations, and extremely low metal particle content.

After the visit, SMM and the delegation members took a group photo with the leaders of Yibin Wanpeng Times Technology Co., Ltd., further strengthening their cooperative friendship. It is believed that deeper exchanges and collaborations will follow in the future!

LinkedIn: https://www.linkedin.com/company/98924065/admin/dashboard/

Facebook: https://www.facebook.com/profile.php?id=61572704694550

X.: https://x.com/CLNB_official

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
15 hours ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
15 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
15 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
15 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
15 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
15 hours ago
CLNB 2025 Global Lithium Battery Tour (Second Stop in Sichuan) - Yibin Wanpeng Times Technology Co., Ltd. - Shanghai Metals Market (SMM)