SMM Analysis: Ternary Cathode Precursor Export Situation in March

Published: Apr 21, 2025 16:13
In March 2025, China's ternary cathode precursor exports totaled 7,033 mt, down 10% MoM and 58.81% YoY. From April 2024 to March 2025, China's cumulative ternary cathode precursor exports (including NCM, NCA, nickel oxides, and NC) reached 169,888 mt, with a cumulative YoY decline of 31.14%.
In March 2025, China's ternary cathode precursor exports totaled 7,033 mt, down 10% MoM and 58.81% YoY. From April 2024 to March 2025, China's cumulative ternary cathode precursor exports (including NCM, NCA, nickel oxides, and NC) reached 169,888 mt, a cumulative YoY decrease of 31.14%. In March, the overall exports of ternary cathode precursors decreased compared to February, with exports of NCM and NC weakening, while NCA exports increased slightly. NC exports in March totaled 2,140 mt, down 4.59% MoM and 43.71% YoY. NCA exports in March were 45 mt. Additionally, NCM exports in March totaled 4,849 mt, down 12.31% MoM and 61.02% YoY. By country, South Korea remained the main export destination for China's NC in March, but its share decreased to 75%, with exports dropping from 1,968 mt in the previous month to 1,605 mt. NCM exports to South Korea decreased from 5,141 mt in the previous month to 4,558 mt. By export province, for nickel oxides and NC, exports in March 2025 totaled 2,140 mt, with Hunan Province accounting for 1,607 mt, or 75%, a decrease in share compared to the previous month. Hubei Province exported 161 mt, an increase of 50.47% MoM. For NCM, exports in March totaled 4,849 mt, with Zhejiang Province exporting 815 mt, a decrease MoM, and its share dropping from 32% to 17%. Jiangxi Province saw an increase in exports, with its share rising from 18% to 22%.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
5 hours ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
5 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
5 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
5 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
5 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
5 hours ago